{"product":"ferc-issuance-bodies","name":"FERC eLibrary Commission order/opinion and ALJ initial-decision text","free":true,"note":"Count plus accession, docket, kind (commission or alj), order kind, date, citation, institution, and library. Order text is the paid GET /ferc-issuances payload. This free manifest lists the cached slips. asOf is the newest issuance date in the cache. Commission Orders/Opinions and ALJ Initial Decisions share this door. Not Delegated Orders, notices, or ALJ procedural orders. Not /ferc-orders (cms.ferc.gov civil-penalty stipulation and show-cause text). Free index/search (?q=, optional before=<catalog id or ISO date>) stays free and includes id, the ?id= URL ($0.02), and the page cursor ($0.05). GET /ferc-issuances?id= is one official text GET ?id= ($0.02). Plain paid GET /ferc-issuances is the newest 10 official texts; older chunk if they ask (?before=<id or date>, another $0.05); newer than a watermark ?since=<ISO timestamp or official catalog id> ($0.05; empty new set is 304 or recordCount 0).","license":"17 USC 105","attribution":"Federal Energy Regulatory Commission. Work of the United States Government; 17 U.S.C. § 105.","payTo":"0xf59621FC406D266e18f314Ae18eF0a33b8401004","network":"base","asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","amountAtomic":"50000","oneAmountAtomic":"20000","priceUsdc":"0.05","fetchedAt":"2026-10-09T15:24:32.926Z","asOf":"2026-10-08","cardCount":415,"listedCount":849,"cards":[{"id":"ferc-commission-20261008-3061","accession":"20261008-3061","docket":"ER26-3487-000","dockets":["ER26-3487-000"],"caseNo":"ER26-3487-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-08","citation":"197 FERC ¶ 61,018","institution":"Letter order accepting Southwest Power Pool, Inc.'s 08/12/2026 filing of proposed revisions to Attachment Z1 of its Open Access Transmission Tariff to revise the Aggregate Transmission Service Study process","library":"Electric","title":"ER26-3487-000 Commission Order/Opinion 197 FERC ¶ 61,018","publishedAt":"2026-10-08","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261008-3061"},{"id":"ferc-commission-20261008-3058","accession":"20261008-3058","docket":"ER26-3477-000","dockets":["ER26-3477-000"],"caseNo":"ER26-3477-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-08","citation":"197 FERC ¶ 61,017","institution":"Letter order accepting Southwest Power Pool, Inc.'s 08/11/2026 filing of an executed High Voltage Direct Current Interconnection Agreement with North Plains Connector LLC and Basin Electric Power Cooperative","library":"Electric","title":"ER26-3477-000 Commission Order/Opinion 197 FERC ¶ 61,017","publishedAt":"2026-10-08","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261008-3058"},{"id":"ferc-commission-20261008-3053","accession":"20261008-3053","docket":"RP26-1250-000","dockets":["RP26-1250-000"],"caseNo":"RP26-1250-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-08","citation":"197 FERC ¶ 61,015","institution":"EQT Energy, LLC et al.","library":"Gas","title":"RP26-1250-000 Commission Order/Opinion 197 FERC ¶ 61,015","publishedAt":"2026-10-08","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261008-3053"},{"id":"ferc-commission-20261008-3043","accession":"20261008-3043","docket":"ER26-3084-001","dockets":["ER26-3084-001"],"caseNo":"ER26-3084-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-08","citation":"197 FERC ¶ 61,016","institution":"Letter order accepting The Narragansett Electric Company's 07/02/2026, as amended on 08/11/2026, filing of a proposed new wholesale distribution tariff that provides the rates, terms, and conditions etc.","library":"Electric","title":"ER26-3084-001 Commission Order/Opinion 197 FERC ¶ 61,016","publishedAt":"2026-10-08","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261008-3043"},{"id":"ferc-commission-20261007-3088","accession":"20261007-3088","docket":"EL15-67-006","dockets":["EL15-67-006","EL15-67-005","ER17-950-007","ER17-950-006","EL21-39-001","EL21-39-000","ER22-1606-000","EL15-18-006","EL15-68-004","EL17-68-003","ER22-1606-002","ER22-1606-001"],"caseNo":"EL15-67-006","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-07","citation":"197 FERC ¶ 61,014","institution":"Consolidated Edison Company of New York, Inc. et al. v. PJM Interconnection, L.L.C","library":"Electric","title":"EL15-67-006 Commission Order/Opinion 197 FERC ¶ 61,014","publishedAt":"2026-10-07","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261007-3088"},{"id":"ferc-commission-20261005-3050","accession":"20261005-3050","docket":"RP26-1246-000","dockets":["RP26-1246-000"],"caseNo":"RP26-1246-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-05","citation":"197 FERC ¶ 61,012","institution":"Venture Global CP2 LNG, LLC","library":"Gas","title":"RP26-1246-000 Commission Order/Opinion 197 FERC ¶ 61,012","publishedAt":"2026-10-05","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261005-3050"},{"id":"ferc-commission-20261005-3048","accession":"20261005-3048","docket":"ER26-3507-000","dockets":["ER26-3507-000"],"caseNo":"ER26-3507-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-05","citation":"197 FERC ¶ 61,013","institution":"St. Landry Solar, LLC et al.","library":"Electric","title":"ER26-3507-000 Commission Order/Opinion 197 FERC ¶ 61,013","publishedAt":"2026-10-05","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261005-3048"},{"id":"ferc-commission-20261002-3033","accession":"20261002-3033","docket":"ER26-3425-000","dockets":["ER26-3425-000"],"caseNo":"ER26-3425-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-02","citation":"197 FERC ¶ 61,008","institution":"Letter order accepting Southwest Power Pool, Inc.'s 08/05/2026 filing of revisions to Section 8.6.1.1 of Attachment AE of its Open Access Transmission Tariff to clarify that Market Storage Resources etc.","library":"Electric","title":"ER26-3425-000 Commission Order/Opinion 197 FERC ¶ 61,008","publishedAt":"2026-10-02","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261002-3033"},{"id":"ferc-commission-20261002-3032","accession":"20261002-3032","docket":"EL26-39-001","dockets":["EL26-39-001"],"caseNo":"EL26-39-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-02","citation":"197 FERC ¶ 61,010","institution":"Gaston Green Acres Solar, LLC et al. v. PJM Interconnection, L.L.C.","library":"Electric","title":"EL26-39-001 Commission Order/Opinion 197 FERC ¶ 61,010","publishedAt":"2026-10-02","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261002-3032"},{"id":"ferc-commission-20261002-3017","accession":"20261002-3017","docket":"ER26-2728-001","dockets":["ER26-2728-001"],"caseNo":"ER26-2728-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-02","citation":"197 FERC ¶ 61,011","institution":"California Grid Holdings LLC","library":"Electric","title":"ER26-2728-001 Commission Order/Opinion 197 FERC ¶ 61,011","publishedAt":"2026-10-02","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261002-3017"},{"id":"ferc-commission-20261002-3016","accession":"20261002-3016","docket":"ER26-1137-001","dockets":["ER26-1137-001","ER26-1137-000"],"caseNo":"ER26-1137-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-02","citation":"197 FERC ¶ 61,009","institution":"Letter order approving Deseret Generation & Transmission Co-operative, Inc.'s 08/04/2026 filing of an Uncontested Offer of Settlement and Settlement Agreement addressing proposed revisions to Attachment H; etc.","library":"Electric","title":"ER26-1137-001 Commission Order/Opinion 197 FERC ¶ 61,009","publishedAt":"2026-10-02","page":1,"before":null,"paidUrl":"/ferc-issuances?id=ferc-commission-20261002-3016"},{"id":"ferc-commission-20261001-3048","accession":"20261001-3048","docket":"RP26-1076-000","dockets":["RP26-1076-000"],"caseNo":"RP26-1076-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-01","citation":"197 FERC ¶ 61,001","institution":"Letter order approving BP Energy Company's et al. 08/24/2026 filing of a petition for approval of a Settlement Agreement pursuant to Rule 207 of the Commission’s Rules of Practice and Procedure","library":"Gas","title":"RP26-1076-000 Commission Order/Opinion 197 FERC ¶ 61,001","publishedAt":"2026-10-01","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261001-3048"},{"id":"ferc-commission-20261001-3047","accession":"20261001-3047","docket":"NJ26-9-000","dockets":["NJ26-9-000"],"caseNo":"NJ26-9-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-01","citation":"197 FERC ¶ 61,003","institution":"Letter order granting Orlando Utilities Commission's 07/29/2026 filing of a petition for declaratory order with revised tariff records requesting that the Commission accept the revisions etc.","library":"Electric","title":"NJ26-9-000 Commission Order/Opinion 197 FERC ¶ 61,003","publishedAt":"2026-10-01","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261001-3047"},{"id":"ferc-commission-20261001-3046","accession":"20261001-3046","docket":"EL26-88-000","dockets":["EL26-88-000","QF02-131-007"],"caseNo":"EL26-88-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-01","citation":"197 FERC ¶ 61,007","institution":"Cycle Horseshoe Bend Wind, LLC","library":"Electric","title":"EL26-88-000 Commission Order/Opinion 197 FERC ¶ 61,007","publishedAt":"2026-10-01","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261001-3046"},{"id":"ferc-commission-20261001-3045","accession":"20261001-3045","docket":"RP26-1070-000","dockets":["RP26-1070-000"],"caseNo":"RP26-1070-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-01","citation":"197 FERC ¶ 61,002","institution":"Calpine Energy Services, L.P. et al.","library":"Gas","title":"RP26-1070-000 Commission Order/Opinion 197 FERC ¶ 61,002","publishedAt":"2026-10-01","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261001-3045"},{"id":"ferc-commission-20261001-3020","accession":"20261001-3020","docket":"ER26-2422-000","dockets":["ER26-2422-000"],"caseNo":"ER26-2422-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-01","citation":"197 FERC ¶ 61,005","institution":"TransAlta Centralia Generation LLC","library":"Electric","title":"ER26-2422-000 Commission Order/Opinion 197 FERC ¶ 61,005","publishedAt":"2026-10-01","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261001-3020"},{"id":"ferc-commission-20261001-3012","accession":"20261001-3012","docket":"EL26-99-000","dockets":["EL26-99-000"],"caseNo":"EL26-99-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-01","citation":"197 FERC ¶ 61,006","institution":"Advantage Capital Renewables, LLC v. PJM Interconnection, L.L.C.","library":"Electric","title":"EL26-99-000 Commission Order/Opinion 197 FERC ¶ 61,006","publishedAt":"2026-10-01","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261001-3012"},{"id":"ferc-commission-20261001-3011","accession":"20261001-3011","docket":"ER26-3750-000","dockets":["ER26-3750-000"],"caseNo":"ER26-3750-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-10-01","citation":"197 FERC ¶ 61,004","institution":"09/08/2026 filing of a request for waiver of Section 10.2.1 of Attachment N of its Xcel Energy Operating Companies Joint Open Access Transmission Tariff, etc., ER26-3750.","library":"Electric","title":"ER26-3750-000 Commission Order/Opinion 197 FERC ¶ 61,004","publishedAt":"2026-10-01","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20261001-3011"},{"id":"ferc-commission-20260930-3104","accession":"20260930-3104","docket":"RP26-946-000","dockets":["RP26-946-000"],"caseNo":"RP26-946-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-30","citation":"196 FERC ¶ 61,250","institution":"RH energytrans, LLC","library":"Gas","title":"RP26-946-000 Commission Order/Opinion 196 FERC ¶ 61,250","publishedAt":"2026-09-30","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260930-3104"},{"id":"ferc-commission-20260930-3093","accession":"20260930-3093","docket":"ER26-3379-000","dockets":["ER26-3379-000"],"caseNo":"ER26-3379-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-30","citation":"196 FERC ¶ 61,252","institution":"ISO New England Inc. et al.","library":"Electric","title":"ER26-3379-000 Commission Order/Opinion 196 FERC ¶ 61,252","publishedAt":"2026-09-30","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260930-3093"},{"id":"ferc-commission-20260930-3083","accession":"20260930-3083","docket":"RP26-1147-000","dockets":["RP26-1147-000"],"caseNo":"RP26-1147-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-30","citation":"196 FERC ¶ 61,251","institution":"Stingray Pipeline Company, L.L.C.","library":"Gas","title":"RP26-1147-000 Commission Order/Opinion 196 FERC ¶ 61,251","publishedAt":"2026-09-30","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260930-3083"},{"id":"ferc-commission-20260930-3078","accession":"20260930-3078","docket":"RP26-1030-000","dockets":["RP26-1030-000"],"caseNo":"RP26-1030-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-30","citation":"196 FERC ¶ 61,249","institution":"Guardian Pipeline, L.L.C.","library":"Gas","title":"RP26-1030-000 Commission Order/Opinion 196 FERC ¶ 61,249","publishedAt":"2026-09-30","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260930-3078"},{"id":"ferc-commission-20260930-3057","accession":"20260930-3057","docket":"ER26-3377-000","dockets":["ER26-3377-000"],"caseNo":"ER26-3377-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-30","citation":"196 FERC ¶ 61,254","institution":"Duke Energy Florida, LLC et al.","library":"Electric","title":"ER26-3377-000 Commission Order/Opinion 196 FERC ¶ 61,254","publishedAt":"2026-09-30","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20260930-3057"},{"id":"ferc-commission-20260930-3039","accession":"20260930-3039","docket":"ER26-3378-000","dockets":["ER26-3378-000"],"caseNo":"ER26-3378-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-30","citation":"196 FERC ¶ 61,253","institution":"Duke Energy Carolinas, LLC et al.","library":"Electric","title":"ER26-3378-000 Commission Order/Opinion 196 FERC ¶ 61,253","publishedAt":"2026-09-30","page":2,"before":"ferc-commission-20261002-3032","paidUrl":"/ferc-issuances?id=ferc-commission-20260930-3039"},{"id":"ferc-commission-20260929-3099","accession":"20260929-3099","docket":"ER26-3380-000","dockets":["ER26-3380-000","EL26-108-000"],"caseNo":"ER26-3380-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-29","citation":"196 FERC ¶ 61,245","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-3380-000 Commission Order/Opinion 196 FERC ¶ 61,245","publishedAt":"2026-09-29","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260929-3099"},{"id":"ferc-commission-20260929-3098","accession":"20260929-3098","docket":"ER26-3186-000","dockets":["ER26-3186-000"],"caseNo":"ER26-3186-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-29","citation":"196 FERC ¶ 61,248","institution":"MS Solar 4, LLC","library":"Electric","title":"ER26-3186-000 Commission Order/Opinion 196 FERC ¶ 61,248","publishedAt":"2026-09-29","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260929-3098"},{"id":"ferc-commission-20260929-3090","accession":"20260929-3090","docket":"ES26-56-000","dockets":["ES26-56-000"],"caseNo":"ES26-56-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-29","citation":"196 FERC ¶ 61,247","institution":"Upper Missouri G. & T. Electric Cooperative, Inc.","library":"Electric","title":"ES26-56-000 Commission Order/Opinion 196 FERC ¶ 61,247","publishedAt":"2026-09-29","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260929-3090"},{"id":"ferc-commission-20260929-3087","accession":"20260929-3087","docket":"ER26-3366-000","dockets":["ER26-3366-000"],"caseNo":"ER26-3366-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-29","citation":"196 FERC ¶ 61,246","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 07/31/2026 filing of revisions to Attachment GGG of its Open Access Transmission, Energy and Operating Reserve Markets Tariff etc.","library":"Electric","title":"ER26-3366-000 Commission Order/Opinion 196 FERC ¶ 61,246","publishedAt":"2026-09-29","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260929-3087"},{"id":"ferc-commission-20260929-3086","accession":"20260929-3086","docket":"ER26-3410-000","dockets":["ER26-3410-000"],"caseNo":"ER26-3410-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-29","citation":"196 FERC ¶ 61,244","institution":"Willis Pond PV1, LLC","library":"Electric","title":"ER26-3410-000 Commission Order/Opinion 196 FERC ¶ 61,244","publishedAt":"2026-09-29","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260929-3086"},{"id":"ferc-commission-20260928-3137","accession":"20260928-3137","docket":"CP23-29-002","dockets":["CP23-29-002"],"caseNo":"CP23-29-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-28","citation":"196 FERC ¶ 61,241","institution":"Saguaro Connector Pipeline, L.L.C.","library":"Gas","title":"CP23-29-002 Commission Order/Opinion 196 FERC ¶ 61,241","publishedAt":"2026-09-28","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260928-3137"},{"id":"ferc-commission-20260928-3136","accession":"20260928-3136","docket":"ER26-3213-000","dockets":["ER26-3213-000"],"caseNo":"ER26-3213-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-28","citation":"196 FERC ¶ 61,240","institution":"Letter order accepting ISO New England Inc.'s et al. 07/21/2026 filing of revisions to its Transmission, Markets and Services Tariff to cap the Capacity Balancing Ratio at 1.0 etc.","library":"Electric","title":"ER26-3213-000 Commission Order/Opinion 196 FERC ¶ 61,240","publishedAt":"2026-09-28","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260928-3136"},{"id":"ferc-commission-20260928-3065","accession":"20260928-3065","docket":"PR26-27-001","dockets":["PR26-27-001","PR26-26-001"],"caseNo":"PR26-27-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-28","citation":"196 FERC ¶ 61,242","institution":"Buffalo Run Pipeline LLC et al.","library":"Gas","title":"PR26-27-001 Commission Order/Opinion 196 FERC ¶ 61,242","publishedAt":"2026-09-28","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260928-3065"},{"id":"ferc-commission-20260928-3053","accession":"20260928-3053","docket":"ER26-3343-000","dockets":["ER26-3343-000"],"caseNo":"ER26-3343-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-28","citation":"196 FERC ¶ 61,243","institution":"SR Quincy Valley, LLC","library":"Electric","title":"ER26-3343-000 Commission Order/Opinion 196 FERC ¶ 61,243","publishedAt":"2026-09-28","page":3,"before":"ferc-commission-20260930-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260928-3053"},{"id":"ferc-commission-20260925-3075","accession":"20260925-3075","docket":"CP26-31-000","dockets":["CP26-31-000"],"caseNo":"CP26-31-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-25","citation":"196 FERC ¶ 61,230","institution":"Rio Grande LNG, LLC et al.","library":"Gas","title":"CP26-31-000 Commission Order/Opinion 196 FERC ¶ 61,230","publishedAt":"2026-09-25","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260925-3075"},{"id":"ferc-commission-20260925-3063","accession":"20260925-3063","docket":"OR26-1-000","dockets":["OR26-1-000"],"caseNo":"OR26-1-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-25","citation":"196 FERC ¶ 61,236","institution":"ExxonMobil Oil Corporation v. LOCAP LLC","library":"Oil","title":"OR26-1-000 Commission Order/Opinion 196 FERC ¶ 61,236","publishedAt":"2026-09-25","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260925-3063"},{"id":"ferc-commission-20260925-3056","accession":"20260925-3056","docket":"ER26-3292-000","dockets":["ER26-3292-000"],"caseNo":"ER26-3292-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-25","citation":"196 FERC ¶ 61,239","institution":"San Diego Gas & Electric","library":"Electric","title":"ER26-3292-000 Commission Order/Opinion 196 FERC ¶ 61,239","publishedAt":"2026-09-25","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260925-3056"},{"id":"ferc-commission-20260925-3055","accession":"20260925-3055","docket":"ER26-3305-000","dockets":["ER26-3305-000"],"caseNo":"ER26-3305-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-25","citation":"196 FERC ¶ 61,238","institution":"California Independent System Operator Corporation","library":"Electric","title":"ER26-3305-000 Commission Order/Opinion 196 FERC ¶ 61,238","publishedAt":"2026-09-25","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260925-3055"},{"id":"ferc-commission-20260925-3017","accession":"20260925-3017","docket":"ER26-3298-000","dockets":["ER26-3298-000"],"caseNo":"ER26-3298-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-25","citation":"196 FERC ¶ 61,237","institution":"Southern Indiana Gas and Electric Company, Inc. et al.","library":"Electric","title":"ER26-3298-000 Commission Order/Opinion 196 FERC ¶ 61,237","publishedAt":"2026-09-25","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260925-3017"},{"id":"ferc-commission-20260924-3091","accession":"20260924-3091","docket":"EL11-66-006","dockets":["EL11-66-006","EL13-33-004","EL16-64-004","ER15-414-005","EL14-86-002"],"caseNo":"EL11-66-006","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-24","citation":"196 FERC ¶ 61,232","institution":"Martha Coakley, Attorney General of the Commonwealth of Massachusetts et al. v. Bangor Hydro-Electric Company et al.","library":"Electric","title":"EL11-66-006 Commission Order/Opinion 196 FERC ¶ 61,232","publishedAt":"2026-09-24","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260924-3091"},{"id":"ferc-commission-20260924-3090","accession":"20260924-3090","docket":"ER25-2145-001","dockets":["ER25-2145-001","EL26-44-001"],"caseNo":"ER25-2145-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-24","citation":"196 FERC ¶ 61,233","institution":"American Municipal Power, Inc. v. American Transmission Systems, Inc.","library":"Electric","title":"ER25-2145-001 Commission Order/Opinion 196 FERC ¶ 61,233","publishedAt":"2026-09-24","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260924-3090"},{"id":"ferc-commission-20260924-3089","accession":"20260924-3089","docket":"EL26-101-000","dockets":["EL26-101-000"],"caseNo":"EL26-101-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-24","citation":"196 FERC ¶ 61,231","institution":"Oklo Inc. v. PJM Interconnection, L.L.C.","library":"Electric","title":"EL26-101-000 Commission Order/Opinion 196 FERC ¶ 61,231","publishedAt":"2026-09-24","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260924-3089"},{"id":"ferc-commission-20260924-3072","accession":"20260924-3072","docket":"PR26-51-000","dockets":["PR26-51-000"],"caseNo":"PR26-51-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-24","citation":"196 FERC ¶ 61,234","institution":"Enable Oklahoma Intrastate Transmission, LLC","library":"Gas","title":"PR26-51-000 Commission Order/Opinion 196 FERC ¶ 61,234","publishedAt":"2026-09-24","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260924-3072"},{"id":"ferc-commission-20260924-3025","accession":"20260924-3025","docket":"AC26-37-000","dockets":["AC26-37-000"],"caseNo":"AC26-37-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-24","citation":"196 FERC ¶ 61,229","institution":"Duke Energy Florida, LLC","library":"Electric","title":"AC26-37-000 Commission Order/Opinion 196 FERC ¶ 61,229","publishedAt":"2026-09-24","page":4,"before":"ferc-commission-20260928-3053","paidUrl":"/ferc-issuances?id=ferc-commission-20260924-3025"},{"id":"ferc-commission-20260923-3100","accession":"20260923-3100","docket":"RP26-855-000","dockets":["RP26-855-000"],"caseNo":"RP26-855-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-23","citation":"196 FERC ¶ 61,228","institution":"NextEra Energy Marketing, LLC","library":"Gas","title":"RP26-855-000 Commission Order/Opinion 196 FERC ¶ 61,228","publishedAt":"2026-09-23","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260923-3100"},{"id":"ferc-commission-20260923-3099","accession":"20260923-3099","docket":"ER26-3413-000","dockets":["ER26-3413-000"],"caseNo":"ER26-3413-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-23","citation":"196 FERC ¶ 61,225","institution":"Vacherie Solar Energy Center, LLC","library":"Electric","title":"ER26-3413-000 Commission Order/Opinion 196 FERC ¶ 61,225","publishedAt":"2026-09-23","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260923-3099"},{"id":"ferc-commission-20260923-3092","accession":"20260923-3092","docket":"RP26-1094-000","dockets":["RP26-1094-000"],"caseNo":"RP26-1094-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-23","citation":"196 FERC ¶ 61,227","institution":"Aethon United BR LP et al.","library":"Gas","title":"RP26-1094-000 Commission Order/Opinion 196 FERC ¶ 61,227","publishedAt":"2026-09-23","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260923-3092"},{"id":"ferc-commission-20260922-3114","accession":"20260922-3114","docket":"ER26-3257-000","dockets":["ER26-3257-000"],"caseNo":"ER26-3257-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-22","citation":"196 FERC ¶ 61,226","institution":"Commonwealth Edison Company","library":"Electric","title":"ER26-3257-000 Commission Order/Opinion 196 FERC ¶ 61,226","publishedAt":"2026-09-22","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260922-3114"},{"id":"ferc-commission-20260922-3072","accession":"20260922-3072","docket":"CP14-347-002","dockets":["CP14-347-002","CP19-19-001"],"caseNo":"CP14-347-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-22","citation":"196 FERC ¶ 61,213","institution":"Magnolia LNG, LLC's Magnolia LNG Project","library":"Gas","title":"CP14-347-002 Commission Order/Opinion 196 FERC ¶ 61,213","publishedAt":"2026-09-22","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260922-3072"},{"id":"ferc-commission-20260922-3022","accession":"20260922-3022","docket":"ER26-3267-000","dockets":["ER26-3267-000"],"caseNo":"ER26-3267-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-22","citation":"196 FERC ¶ 61,212","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 07/24/2026, as supplemented on 07/27/2026, filing of proposed revisions to Attachment X etc.","library":"Electric","title":"ER26-3267-000 Commission Order/Opinion 196 FERC ¶ 61,212","publishedAt":"2026-09-22","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260922-3022"},{"id":"ferc-commission-20260922-3019","accession":"20260922-3019","docket":"ER26-2401-001","dockets":["ER26-2401-001","ER26-2403-001"],"caseNo":"ER26-2401-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-22","citation":"196 FERC ¶ 61,219","institution":"Letter order accepting Southwest Power Pool, Inc.'s 04/30/2026, as amended on 07/24/2026, filing of two executed, firm Point-to-Point Transmission Service Agreements with Incorporated County of Los Alamos","library":"Electric","title":"ER26-2401-001 Commission Order/Opinion 196 FERC ¶ 61,219","publishedAt":"2026-09-22","page":5,"before":"ferc-commission-20260924-3072","paidUrl":"/ferc-issuances?id=ferc-commission-20260922-3019"},{"id":"ferc-commission-20260921-3081","accession":"20260921-3081","docket":"ER10-2249-015","dockets":["ER10-2249-015"],"caseNo":"ER10-2249-015","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,223","institution":"Portland General Electric Company","library":"Electric","title":"ER10-2249-015 Commission Order/Opinion 196 FERC ¶ 61,223","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3081"},{"id":"ferc-commission-20260921-3060","accession":"20260921-3060","docket":"EL26-32-001","dockets":["EL26-32-001"],"caseNo":"EL26-32-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,221","institution":"Santa Paula Energy Storage, LLC et al. v. Southern California Edison Company","library":"Electric","title":"EL26-32-001 Commission Order/Opinion 196 FERC ¶ 61,221","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3060"},{"id":"ferc-commission-20260921-3057","accession":"20260921-3057","docket":"ER26-3093-000","dockets":["ER26-3093-000"],"caseNo":"ER26-3093-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,222","institution":"Northwest Power Pool","library":"Electric","title":"ER26-3093-000 Commission Order/Opinion 196 FERC ¶ 61,222","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3057"},{"id":"ferc-commission-20260921-3056","accession":"20260921-3056","docket":"EL26-72-001","dockets":["EL26-72-001"],"caseNo":"EL26-72-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,215","institution":"ISO New England Inc. et al.","library":"Electric","title":"EL26-72-001 Commission Order/Opinion 196 FERC ¶ 61,215","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3056"},{"id":"ferc-commission-20260921-3047","accession":"20260921-3047","docket":"EL26-70-001","dockets":["EL26-70-001"],"caseNo":"EL26-70-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,217","institution":"Midcontinent Independent System Operator, Inc. et al.","library":"Electric","title":"EL26-70-001 Commission Order/Opinion 196 FERC ¶ 61,217","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3047"},{"id":"ferc-commission-20260921-3043","accession":"20260921-3043","docket":"RP25-989-007","dockets":["RP25-989-007"],"caseNo":"RP25-989-007","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,220","institution":"Letter order approving Northern Natural Gas Company's 03/17/2026 filing of a Stipulation and Agreement etc.","library":"Gas","title":"RP25-989-007 Commission Order/Opinion 196 FERC ¶ 61,220","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3043"},{"id":"ferc-commission-20260921-3023","accession":"20260921-3023","docket":"ER26-3245-000","dockets":["ER26-3245-000"],"caseNo":"ER26-3245-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,224","institution":"Laurel Run Interconnection LLC","library":"Electric","title":"ER26-3245-000 Commission Order/Opinion 196 FERC ¶ 61,224","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3023"},{"id":"ferc-commission-20260921-3021","accession":"20260921-3021","docket":"EL26-69-001","dockets":["EL26-69-001"],"caseNo":"EL26-69-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,218","institution":"New York Independent System Operator, Inc. et al.","library":"Electric","title":"EL26-69-001 Commission Order/Opinion 196 FERC ¶ 61,218","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3021"},{"id":"ferc-commission-20260921-3020","accession":"20260921-3020","docket":"EL26-67-001","dockets":["EL26-67-001"],"caseNo":"EL26-67-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,214","institution":"PJM Interconnection, L.L.C. et al.","library":"Electric","title":"EL26-67-001 Commission Order/Opinion 196 FERC ¶ 61,214","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3020"},{"id":"ferc-commission-20260921-3019","accession":"20260921-3019","docket":"EL26-71-001","dockets":["EL26-71-001"],"caseNo":"EL26-71-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-21","citation":"196 FERC ¶ 61,216","institution":"California Independent System Operator Corporation et al.","library":"Electric","title":"EL26-71-001 Commission Order/Opinion 196 FERC ¶ 61,216","publishedAt":"2026-09-21","page":6,"before":"ferc-commission-20260922-3114","paidUrl":"/ferc-issuances?id=ferc-commission-20260921-3019"},{"id":"ferc-commission-20260918-3085","accession":"20260918-3085","docket":"ER26-3201-000","dockets":["ER26-3201-000"],"caseNo":"ER26-3201-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-18","citation":"196 FERC ¶ 61,210","institution":"Letter order accepting Commonwealth Edison Company's 07/21/2026 filing of a Notice of Cancellation of the Transmission Security Agreement with Monarch Rock Air LLC","library":"Electric","title":"ER26-3201-000 Commission Order/Opinion 196 FERC ¶ 61,210","publishedAt":"2026-09-18","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260918-3085"},{"id":"ferc-commission-20260918-3084","accession":"20260918-3084","docket":"ER26-3200-000","dockets":["ER26-3200-000"],"caseNo":"ER26-3200-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-18","citation":"196 FERC ¶ 61,211","institution":"Commonwealth Edison Company","library":"Electric","title":"ER26-3200-000 Commission Order/Opinion 196 FERC ¶ 61,211","publishedAt":"2026-09-18","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260918-3084"},{"id":"ferc-commission-20260918-3079","accession":"20260918-3079","docket":"ER26-1206-003","dockets":["ER26-1206-003","ER26-1206-000"],"caseNo":"ER26-1206-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-18","citation":"196 FERC ¶ 61,209","institution":"Letter order approving Consolidated Edison Company of New York, Inc.'s 07/24/2026 filing of a Joint Offer of Settlement resolving issues set for hearing and settlement judge procedures relating to its proposed revisions etc.","library":"Electric","title":"ER26-1206-003 Commission Order/Opinion 196 FERC ¶ 61,209","publishedAt":"2026-09-18","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260918-3079"},{"id":"ferc-commission-20260917-3138","accession":"20260917-3138","docket":"ER26-2603-001","dockets":["ER26-2603-001"],"caseNo":"ER26-2603-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-17","citation":"196 FERC ¶ 61,208","institution":"FH Opco LLC","library":"Electric","title":"ER26-2603-001 Commission Order/Opinion 196 FERC ¶ 61,208","publishedAt":"2026-09-17","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260917-3138"},{"id":"ferc-commission-20260917-3088","accession":"20260917-3088","docket":"RP26-1063-000","dockets":["RP26-1063-000"],"caseNo":"RP26-1063-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-17","citation":"196 FERC ¶ 61,207","institution":"Expand Energy Marketing LLC et al.","library":"Gas","title":"RP26-1063-000 Commission Order/Opinion 196 FERC ¶ 61,207","publishedAt":"2026-09-17","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260917-3088"},{"id":"ferc-commission-20260917-3015","accession":"20260917-3015","docket":"PR25-49-001","dockets":["PR25-49-001"],"caseNo":"PR25-49-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-17","citation":"196 FERC ¶ 61,206","institution":"Letter order accepting Delta North Louisiana Gas Company, LLC's 07/23/2026 filing of an amendment to revise its baseline Statement of Operating Conditions","library":"Gas","title":"PR25-49-001 Commission Order/Opinion 196 FERC ¶ 61,206","publishedAt":"2026-09-17","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260917-3015"},{"id":"ferc-commission-20260915-3056","accession":"20260915-3056","docket":"RP25-855-003","dockets":["RP25-855-003","RP25-855-000"],"caseNo":"RP25-855-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-15","citation":"196 FERC ¶ 61,202","institution":"Great Lakes Gas Transmission Limited Partnership","library":"Gas","title":"RP25-855-003 Commission Order/Opinion 196 FERC ¶ 61,202","publishedAt":"2026-09-15","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260915-3056"},{"id":"ferc-commission-20260915-3035","accession":"20260915-3035","docket":"ER16-1341-006","dockets":["ER16-1341-006"],"caseNo":"ER16-1341-006","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-15","citation":"196 FERC ¶ 61,205","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER16-1341-006 Commission Order/Opinion 196 FERC ¶ 61,205","publishedAt":"2026-09-15","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260915-3035"},{"id":"ferc-commission-20260914-3103","accession":"20260914-3103","docket":"ER26-3180-000","dockets":["ER26-3180-000"],"caseNo":"ER26-3180-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,204","institution":"Letter order rejecting Green Recursive Utility Service LLC's 07/16/2026 filing of a baseline tariff establishing the uniform metered carriage tariff governing commercial consumption of its data infrastructure substrate","library":"Electric","title":"ER26-3180-000 Commission Order/Opinion 196 FERC ¶ 61,204","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3103"},{"id":"ferc-commission-20260914-3102","accession":"20260914-3102","docket":"CP26-24-000","dockets":["CP26-24-000"],"caseNo":"CP26-24-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,196","institution":"Texas Eastern Transmission, LP's Kosciusko Compressor Station Replacement Project","library":"Gas","title":"CP26-24-000 Commission Order/Opinion 196 FERC ¶ 61,196","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3102"},{"id":"ferc-commission-20260914-3100","accession":"20260914-3100","docket":"RP22-824-002","dockets":["RP22-824-002"],"caseNo":"RP22-824-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,201","institution":"Young Gas Storage Company, Ltd.","library":"Gas","title":"RP22-824-002 Commission Order/Opinion 196 FERC ¶ 61,201","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3100"},{"id":"ferc-commission-20260914-3099","accession":"20260914-3099","docket":"ER26-3176-000","dockets":["ER26-3176-000"],"caseNo":"ER26-3176-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,198","institution":"ISO New England Inc.","library":"Electric","title":"ER26-3176-000 Commission Order/Opinion 196 FERC ¶ 61,198","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3099"},{"id":"ferc-commission-20260914-3098","accession":"20260914-3098","docket":"RP22-825-003","dockets":["RP22-825-003"],"caseNo":"RP22-825-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,203","institution":"Colorado Interstate Gas Company, L.L.C.","library":"Gas","title":"RP22-825-003 Commission Order/Opinion 196 FERC ¶ 61,203","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3098"},{"id":"ferc-commission-20260914-3043","accession":"20260914-3043","docket":"ER25-209-001","dockets":["ER25-209-001","ER25-209-000","ER25-1794-001","ER24-530-000","ER26-3057-000","ER25-621-000","ER26-3058-000","ER26-658-000","ER26-3059-000"],"caseNo":"ER25-209-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,195","institution":"Letter order accepting Pacific Gas and Electric Company's 07/01/2026 filing of an Offer of Settlement addressing all of the issues set for hearing in its fourth Wholesale Distribution Tariff, etc.","library":"Electric","title":"ER25-209-001 Commission Order/Opinion 196 FERC ¶ 61,195","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3043"},{"id":"ferc-commission-20260914-3042","accession":"20260914-3042","docket":"RP26-802-003","dockets":["RP26-802-003"],"caseNo":"RP26-802-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,194","institution":"Southern Star Central Gas Pipeline, Inc.","library":"Gas","title":"RP26-802-003 Commission Order/Opinion 196 FERC ¶ 61,194","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3042"},{"id":"ferc-commission-20260914-3040","accession":"20260914-3040","docket":"ER24-1670-000","dockets":["ER24-1670-000"],"caseNo":"ER24-1670-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,197","institution":"Dynasty Power Inc.","library":"Electric","title":"ER24-1670-000 Commission Order/Opinion 196 FERC ¶ 61,197","publishedAt":"2026-09-14","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3040"},{"id":"ferc-commission-20260914-3038","accession":"20260914-3038","docket":"ER22-1986-000","dockets":["ER22-1986-000"],"caseNo":"ER22-1986-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,199","institution":"Basin Electric Power Cooperative et al.","library":"Electric","title":"ER22-1986-000 Commission Order/Opinion 196 FERC ¶ 61,199","publishedAt":"2026-09-14","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3038"},{"id":"ferc-commission-20260914-3022","accession":"20260914-3022","docket":"ER26-2699-001","dockets":["ER26-2699-001"],"caseNo":"ER26-2699-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-14","citation":"196 FERC ¶ 61,200","institution":"Sun Chief Solar Farm, LLC","library":"Electric","title":"ER26-2699-001 Commission Order/Opinion 196 FERC ¶ 61,200","publishedAt":"2026-09-14","page":7,"before":"ferc-commission-20260921-3081","paidUrl":"/ferc-issuances?id=ferc-commission-20260914-3022"},{"id":"ferc-commission-20260911-3014","accession":"20260911-3014","docket":"ER26-2466-002","dockets":["ER26-2466-002"],"caseNo":"ER26-2466-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-11","citation":"196 FERC ¶ 61,193","institution":"El Paso Electric Company","library":"Electric","title":"ER26-2466-002 Commission Order/Opinion 196 FERC ¶ 61,193","publishedAt":"2026-09-11","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260911-3014"},{"id":"ferc-commission-20260910-3104","accession":"20260910-3104","docket":"CP26-16-000","dockets":["CP26-16-000"],"caseNo":"CP26-16-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,192","institution":"Texas Gas Transmission, LLC's Carnation Project","library":"Gas","title":"CP26-16-000 Commission Order/Opinion 196 FERC ¶ 61,192","publishedAt":"2026-09-10","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3104"},{"id":"ferc-commission-20260910-3103","accession":"20260910-3103","docket":"CP25-547-000","dockets":["CP25-547-000","CP25-549-000"],"caseNo":"CP25-547-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,190","institution":"Gulf South Pipeline Company, LLC's et al. Kosciusko Junction Pipeline Project","library":"Gas","title":"CP25-547-000 Commission Order/Opinion 196 FERC ¶ 61,190","publishedAt":"2026-09-10","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3103"},{"id":"ferc-commission-20260910-3043","accession":"20260910-3043","docket":"CP26-104-000","dockets":["CP26-104-000"],"caseNo":"CP26-104-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,191","institution":"Venture Global Gator Express, LLC's Gator Express Capacity Project","library":"Gas","title":"CP26-104-000 Commission Order/Opinion 196 FERC ¶ 61,191","publishedAt":"2026-09-10","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3043"},{"id":"ferc-commission-20260910-3042","accession":"20260910-3042","docket":"EL26-45-000","dockets":["EL26-45-000"],"caseNo":"EL26-45-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,185","institution":"ISO New England Inc.","library":"Electric","title":"EL26-45-000 Commission Order/Opinion 196 FERC ¶ 61,185","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3042"},{"id":"ferc-commission-20260910-3040","accession":"20260910-3040","docket":"ER20-1385-004","dockets":["ER20-1385-004","ER22-210-002","ER17-1370-010","ER22-1929-002","ER21-1498-003","ER10-3194-009","ER22-1928-001","ER16-581-011","ER21-2204-004","ER16-2271-010","ER21-1254-004","ER10-3195-010","ER22-1927-002","ER22-1945-001","ER20-1853-003"],"caseNo":"ER20-1385-004","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,187","institution":"Bluestone Farm Solar, LLC et al.","library":"Electric","title":"ER20-1385-004 Commission Order/Opinion 196 FERC ¶ 61,187","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3040"},{"id":"ferc-commission-20260910-3039","accession":"20260910-3039","docket":"RD26-9-000","dockets":["RD26-9-000"],"caseNo":"RD26-9-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,184","institution":"North American Electric Reliability Corporation","library":"Electric","title":"RD26-9-000 Commission Order/Opinion 196 FERC ¶ 61,184","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3039"},{"id":"ferc-commission-20260910-3038","accession":"20260910-3038","docket":"EC26-76-000","dockets":["EC26-76-000"],"caseNo":"EC26-76-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,186","institution":"Grays Harbor Energy LLC et al.","library":"Electric","title":"EC26-76-000 Commission Order/Opinion 196 FERC ¶ 61,186","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3038"},{"id":"ferc-commission-20260910-3037","accession":"20260910-3037","docket":"CP26-9-000","dockets":["CP26-9-000","CP26-9-001"],"caseNo":"CP26-9-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,183","institution":"UGI Auburn, LLC et al.","library":"Gas","title":"CP26-9-000 Commission Order/Opinion 196 FERC ¶ 61,183","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3037"},{"id":"ferc-commission-20260910-3036","accession":"20260910-3036","docket":"ER19-266-004","dockets":["ER19-266-004","ER19-266-005","ER24-2166-003","ER24-2166-004","ER18-2370-006","ER18-2370-007"],"caseNo":"ER19-266-004","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,182","institution":"Invenergy Nelson LLC et al.","library":"Electric","title":"ER19-266-004 Commission Order/Opinion 196 FERC ¶ 61,182","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3036"},{"id":"ferc-commission-20260910-3035","accession":"20260910-3035","docket":"ER26-1861-001","dockets":["ER26-1861-001"],"caseNo":"ER26-1861-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,181","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER26-1861-001 Commission Order/Opinion 196 FERC ¶ 61,181","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3035"},{"id":"ferc-commission-20260910-3034","accession":"20260910-3034","docket":"ER23-316-000","dockets":["ER23-316-000"],"caseNo":"ER23-316-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,180","institution":"Calpine Energy Services, L.P.","library":"Electric","title":"ER23-316-000 Commission Order/Opinion 196 FERC ¶ 61,180","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3034"},{"id":"ferc-commission-20260910-3033","accession":"20260910-3033","docket":"ER23-450-000","dockets":["ER23-450-000"],"caseNo":"ER23-450-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,179","institution":"Mercuria Energy America, LLC","library":"Electric","title":"ER23-450-000 Commission Order/Opinion 196 FERC ¶ 61,179","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3033"},{"id":"ferc-commission-20260910-3031","accession":"20260910-3031","docket":"ER23-276-000","dockets":["ER23-276-000"],"caseNo":"ER23-276-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,178","institution":"TransAlta Energy Marketing (U.S.) Inc.","library":"Electric","title":"ER23-276-000 Commission Order/Opinion 196 FERC ¶ 61,178","publishedAt":"2026-09-10","page":9,"before":"ferc-commission-20260910-3030","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3031"},{"id":"ferc-commission-20260910-3030","accession":"20260910-3030","docket":"ER20-681-016","dockets":["ER20-681-016"],"caseNo":"ER20-681-016","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-10","citation":"196 FERC ¶ 61,177","institution":"Tri-State Generation and Transmission Association, Inc.","library":"Electric","title":"ER20-681-016 Commission Order/Opinion 196 FERC ¶ 61,177","publishedAt":"2026-09-10","page":8,"before":"ferc-commission-20260914-3038","paidUrl":"/ferc-issuances?id=ferc-commission-20260910-3030"},{"id":"ferc-commission-20260908-3067","accession":"20260908-3067","docket":"ER26-3134-000","dockets":["ER26-3134-000"],"caseNo":"ER26-3134-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-08","citation":"196 FERC ¶ 61,176","institution":"Southern California Edison Company","library":"Electric","title":"ER26-3134-000 Commission Order/Opinion 196 FERC ¶ 61,176","publishedAt":"2026-09-08","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260908-3067"},{"id":"ferc-commission-20260902-3060","accession":"20260902-3060","docket":"RP26-1041-000","dockets":["RP26-1041-000"],"caseNo":"RP26-1041-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-02","citation":"196 FERC ¶ 61,175","institution":"Shell Offshore Inc. et al.","library":"Gas","title":"RP26-1041-000 Commission Order/Opinion 196 FERC ¶ 61,175","publishedAt":"2026-09-02","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260902-3060"},{"id":"ferc-commission-20260901-3048","accession":"20260901-3048","docket":"ER22-2303-000","dockets":["ER22-2303-000","ER22-2307-000","ER22-2346-000","ER22-2356-001","ER22-2306-000","ER22-2348-000","ER22-2349-000"],"caseNo":"ER22-2303-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-09-01","citation":"196 FERC ¶ 61,174","institution":"Letter order accepting Black Hills Colorado Electric, LLC's et al. 07/24/2026 filing of a joint motion for deferral of the effective date for revisions to the respective Open Access Transmission Tariffs etc.","library":"Electric","title":"ER22-2303-000 Commission Order/Opinion 196 FERC ¶ 61,174","publishedAt":"2026-09-01","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260901-3048"},{"id":"ferc-commission-20260831-3081","accession":"20260831-3081","docket":"ER26-3172-000","dockets":["ER26-3172-000"],"caseNo":"ER26-3172-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-31","citation":"196 FERC ¶ 61,167","institution":"The Empire District Electric Company","library":"Electric","title":"ER26-3172-000 Commission Order/Opinion 196 FERC ¶ 61,167","publishedAt":"2026-08-31","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260831-3081"},{"id":"ferc-commission-20260831-3069","accession":"20260831-3069","docket":"IS26-568-000","dockets":["IS26-568-000"],"caseNo":"IS26-568-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-31","citation":"196 FERC ¶ 61,162","institution":"Buckeye Pipe Line Company, L.P.'s Broadway Project","library":"Oil","title":"IS26-568-000 Commission Order/Opinion 196 FERC ¶ 61,162","publishedAt":"2026-08-31","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260831-3069"},{"id":"ferc-commission-20260831-3064","accession":"20260831-3064","docket":"ER18-575-002","dockets":["ER18-575-002","ER18-578-002","ER18-574-002"],"caseNo":"ER18-575-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-31","citation":"196 FERC ¶ 61,170","institution":"Monument Generating Station, LLC et al.","library":"Electric","title":"ER18-575-002 Commission Order/Opinion 196 FERC ¶ 61,170","publishedAt":"2026-08-31","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260831-3064"},{"id":"ferc-commission-20260831-3060","accession":"20260831-3060","docket":"ER26-3083-000","dockets":["ER26-3083-000"],"caseNo":"ER26-3083-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-31","citation":"196 FERC ¶ 61,169","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 07/02/2026 filing of proposed revisions to Module E-2 of its Open Access Transmission, Energy and Operating Reserve Markets Tariff etc. ER26-3083.","library":"Electric","title":"ER26-3083-000 Commission Order/Opinion 196 FERC ¶ 61,169","publishedAt":"2026-08-31","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260831-3060"},{"id":"ferc-commission-20260831-3054","accession":"20260831-3054","docket":"ER26-3098-000","dockets":["ER26-3098-000"],"caseNo":"ER26-3098-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-31","citation":"196 FERC ¶ 61,173","institution":"Letter order accepting Southwest Power Pool, Inc.'s 07/02/2026 filing of revisions to Sections 8.5.12 and 8.5.13 of Attachment AE of its Open Access Transmission Tariff to modify the calculations for total congestion revenues etc.","library":"Electric","title":"ER26-3098-000 Commission Order/Opinion 196 FERC ¶ 61,173","publishedAt":"2026-08-31","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260831-3054"},{"id":"ferc-commission-20260831-3049","accession":"20260831-3049","docket":"ER26-2974-000","dockets":["ER26-2974-000"],"caseNo":"ER26-2974-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-31","citation":"196 FERC ¶ 61,171","institution":"Midcontinent Independent System Operator, Inc.","library":"Electric","title":"ER26-2974-000 Commission Order/Opinion 196 FERC ¶ 61,171","publishedAt":"2026-08-31","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260831-3049"},{"id":"ferc-commission-20260831-3020","accession":"20260831-3020","docket":"ER26-3047-000","dockets":["ER26-3047-000"],"caseNo":"ER26-3047-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-31","citation":"196 FERC ¶ 61,172","institution":"ISO New England Inc. et al.","library":"Electric","title":"ER26-3047-000 Commission Order/Opinion 196 FERC ¶ 61,172","publishedAt":"2026-08-31","page":10,"before":"ferc-commission-20260910-3042","paidUrl":"/ferc-issuances?id=ferc-commission-20260831-3020"},{"id":"ferc-commission-20260828-3069","accession":"20260828-3069","docket":"EL26-49-000","dockets":["EL26-49-000"],"caseNo":"EL26-49-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-28","citation":"196 FERC ¶ 61,161","institution":"Complaint and Petition of the Center for Security Policy and the Secure the Grid Coalition v. North American Electric Reliability Corporation","library":"Electric","title":"EL26-49-000 Commission Order/Opinion 196 FERC ¶ 61,161","publishedAt":"2026-08-28","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260828-3069"},{"id":"ferc-commission-20260828-3062","accession":"20260828-3062","docket":"EC25-140-001","dockets":["EC25-140-001"],"caseNo":"EC25-140-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-28","citation":"196 FERC ¶ 61,164","institution":"Troy ParentCo LLC et al.","library":"Electric","title":"EC25-140-001 Commission Order/Opinion 196 FERC ¶ 61,164","publishedAt":"2026-08-28","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260828-3062"},{"id":"ferc-commission-20260828-3057","accession":"20260828-3057","docket":"ER23-628-000","dockets":["ER23-628-000","EL23-25-000","ER23-628-002"],"caseNo":"ER23-628-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-28","citation":"196 FERC ¶ 61,163","institution":"Letter order approving Bellflower Solar 1, LLC's 09/29/2023 filing of an Offer of Settlement and Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"ER23-628-000 Commission Order/Opinion 196 FERC ¶ 61,163","publishedAt":"2026-08-28","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260828-3057"},{"id":"ferc-commission-20260828-3052","accession":"20260828-3052","docket":"ER26-2244-001","dockets":["ER26-2244-001"],"caseNo":"ER26-2244-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-28","citation":"196 FERC ¶ 61,168","institution":"Hillsboro Solar, LLC","library":"Electric","title":"ER26-2244-001 Commission Order/Opinion 196 FERC ¶ 61,168","publishedAt":"2026-08-28","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260828-3052"},{"id":"ferc-commission-20260828-3037","accession":"20260828-3037","docket":"ER26-2000-000","dockets":["ER26-2000-000","ER26-2000-001","ER26-1999-001"],"caseNo":"ER26-2000-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-28","citation":"196 FERC ¶ 61,166","institution":"Entergy Services, LLC et al.","library":"Electric","title":"ER26-2000-000 Commission Order/Opinion 196 FERC ¶ 61,166","publishedAt":"2026-08-28","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260828-3037"},{"id":"ferc-commission-20260828-3032","accession":"20260828-3032","docket":"ER26-1990-001","dockets":["ER26-1990-001"],"caseNo":"ER26-1990-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-28","citation":"196 FERC ¶ 61,165","institution":"PSEG Energy Resources & Trade LLC","library":"Electric","title":"ER26-1990-001 Commission Order/Opinion 196 FERC ¶ 61,165","publishedAt":"2026-08-28","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260828-3032"},{"id":"ferc-commission-20260827-3027","accession":"20260827-3027","docket":"ER24-2217-002","dockets":["ER24-2217-002"],"caseNo":"ER24-2217-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-27","citation":"196 FERC ¶ 61,158","institution":"Letter order accepting SunZia Transmission, LLC's 06/10/2024 filing of proposed revisions to its Open Access Transmission Tariff in compliance with the requirements of Order Nos. 2023 and 2023-A etc.","library":"Electric","title":"ER24-2217-002 Commission Order/Opinion 196 FERC ¶ 61,158","publishedAt":"2026-08-27","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260827-3027"},{"id":"ferc-commission-20260827-3021","accession":"20260827-3021","docket":"ER26-2023-001","dockets":["ER26-2023-001"],"caseNo":"ER26-2023-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-27","citation":"196 FERC ¶ 61,159","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 04/03/2026, as amended on 06/30/2026, filing of an Executed, Non-conforming Expedited Generator Interconnection Agreement with Ameren Services Company etc.","library":"Electric","title":"ER26-2023-001 Commission Order/Opinion 196 FERC ¶ 61,159","publishedAt":"2026-08-27","page":11,"before":"ferc-commission-20260831-3060","paidUrl":"/ferc-issuances?id=ferc-commission-20260827-3021"},{"id":"ferc-commission-20260826-3025","accession":"20260826-3025","docket":"RP26-989-000","dockets":["RP26-989-000"],"caseNo":"RP26-989-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-26","citation":"196 FERC ¶ 61,157","institution":"Exxon Mobil Oil Corporation et al.","library":"Gas","title":"RP26-989-000 Commission Order/Opinion 196 FERC ¶ 61,157","publishedAt":"2026-08-26","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260826-3025"},{"id":"ferc-commission-20260825-3051","accession":"20260825-3051","docket":"ER26-3104-000","dockets":["ER26-3104-000"],"caseNo":"ER26-3104-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-25","citation":"196 FERC ¶ 61,156","institution":"California Independent System Operator Corporation","library":"Electric","title":"ER26-3104-000 Commission Order/Opinion 196 FERC ¶ 61,156","publishedAt":"2026-08-25","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260825-3051"},{"id":"ferc-commission-20260824-3095","accession":"20260824-3095","docket":"EL26-41-000","dockets":["EL26-41-000"],"caseNo":"EL26-41-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-24","citation":"196 FERC ¶ 61,152","institution":"Terminus Hydroelectric, LLC v. California Independent System Operator Corporation","library":"Electric","title":"EL26-41-000 Commission Order/Opinion 196 FERC ¶ 61,152","publishedAt":"2026-08-24","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260824-3095"},{"id":"ferc-commission-20260824-3041","accession":"20260824-3041","docket":"ER22-2339-000","dockets":["ER22-2339-000"],"caseNo":"ER22-2339-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-24","citation":"196 FERC ¶ 61,151","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER22-2339-000 Commission Order/Opinion 196 FERC ¶ 61,151","publishedAt":"2026-08-24","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260824-3041"},{"id":"ferc-commission-20260824-3039","accession":"20260824-3039","docket":"TX25-5-000","dockets":["TX25-5-000"],"caseNo":"TX25-5-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-24","citation":"196 FERC ¶ 61,153","institution":"Seattle City Light","library":"Electric","title":"TX25-5-000 Commission Order/Opinion 196 FERC ¶ 61,153","publishedAt":"2026-08-24","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260824-3039"},{"id":"ferc-commission-20260824-3038","accession":"20260824-3038","docket":"EC26-67-000","dockets":["EC26-67-000"],"caseNo":"EC26-67-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-24","citation":"196 FERC ¶ 61,155","institution":"Grays Harbor Energy LLC et al.","library":"Electric","title":"EC26-67-000 Commission Order/Opinion 196 FERC ¶ 61,155","publishedAt":"2026-08-24","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260824-3038"},{"id":"ferc-commission-20260821-3055","accession":"20260821-3055","docket":"ER20-2054-000","dockets":["ER20-2054-000"],"caseNo":"ER20-2054-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-21","citation":"196 FERC ¶ 61,150","institution":"The Connecticut Light and Power Company et al.","library":"Electric","title":"ER20-2054-000 Commission Order/Opinion 196 FERC ¶ 61,150","publishedAt":"2026-08-21","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260821-3055"},{"id":"ferc-commission-20260821-3027","accession":"20260821-3027","docket":"ER26-2902-000","dockets":["ER26-2902-000"],"caseNo":"ER26-2902-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-21","citation":"196 FERC ¶ 61,149","institution":"International Transmission Company et al.","library":"Electric","title":"ER26-2902-000 Commission Order/Opinion 196 FERC ¶ 61,149","publishedAt":"2026-08-21","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260821-3027"},{"id":"ferc-commission-20260820-3075","accession":"20260820-3075","docket":"ER26-2943-000","dockets":["ER26-2943-000"],"caseNo":"ER26-2943-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-20","citation":"196 FERC ¶ 61,146","institution":"Letter order accepting Southwest Power Pool, Inc.'s 06/24/2026 filing of revisions to Attachment AY of its Open Access Transmission Tariff etc.","library":"Electric","title":"ER26-2943-000 Commission Order/Opinion 196 FERC ¶ 61,146","publishedAt":"2026-08-20","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260820-3075"},{"id":"ferc-commission-20260820-3057","accession":"20260820-3057","docket":"ER26-3060-000","dockets":["ER26-3060-000"],"caseNo":"ER26-3060-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-20","citation":"196 FERC ¶ 61,147","institution":"McCallum Enterprises I Limited Partnership","library":"Electric","title":"ER26-3060-000 Commission Order/Opinion 196 FERC ¶ 61,147","publishedAt":"2026-08-20","page":12,"before":"ferc-commission-20260827-3021","paidUrl":"/ferc-issuances?id=ferc-commission-20260820-3057"},{"id":"ferc-commission-20260819-3092","accession":"20260819-3092","docket":"ER26-2778-000","dockets":["ER26-2778-000"],"caseNo":"ER26-2778-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-19","citation":"196 FERC ¶ 61,139","institution":"Ringer Solar Energy LLC","library":"Electric","title":"ER26-2778-000 Commission Order/Opinion 196 FERC ¶ 61,139","publishedAt":"2026-08-19","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260819-3092"},{"id":"ferc-commission-20260819-3087","accession":"20260819-3087","docket":"ER26-2592-000","dockets":["ER26-2592-000"],"caseNo":"ER26-2592-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-19","citation":"196 FERC ¶ 61,142","institution":"Letter order accepting Southwest Power Pool, Inc.'s 05/21/2026 filing of revisions to Attachment AE of its Open Access Transmission Tariff etc.","library":"Electric","title":"ER26-2592-000 Commission Order/Opinion 196 FERC ¶ 61,142","publishedAt":"2026-08-19","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260819-3087"},{"id":"ferc-commission-20260819-3072","accession":"20260819-3072","docket":"ER25-387-000","dockets":["ER25-387-000"],"caseNo":"ER25-387-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-19","citation":"196 FERC ¶ 61,145","institution":"Tenaska Power Services Company","library":"Electric","title":"ER25-387-000 Commission Order/Opinion 196 FERC ¶ 61,145","publishedAt":"2026-08-19","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260819-3072"},{"id":"ferc-commission-20260819-3069","accession":"20260819-3069","docket":"ER22-2948-000","dockets":["ER22-2948-000"],"caseNo":"ER22-2948-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-19","citation":"196 FERC ¶ 61,143","institution":"Puget Sound Energy, Inc.","library":"Electric","title":"ER22-2948-000 Commission Order/Opinion 196 FERC ¶ 61,143","publishedAt":"2026-08-19","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260819-3069"},{"id":"ferc-commission-20260819-3064","accession":"20260819-3064","docket":"ER22-2981-000","dockets":["ER22-2981-000"],"caseNo":"ER22-2981-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-19","citation":"196 FERC ¶ 61,144","institution":"TransAlta Energy Marketing (U.S.) Inc.","library":"Electric","title":"ER22-2981-000 Commission Order/Opinion 196 FERC ¶ 61,144","publishedAt":"2026-08-19","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260819-3064"},{"id":"ferc-commission-20260818-3043","accession":"20260818-3043","docket":"ER26-2739-002","dockets":["ER26-2739-002","ER26-2740-002"],"caseNo":"ER26-2739-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-18","citation":"196 FERC ¶ 61,140","institution":"H.A. Wagner LLC et al.","library":"Electric","title":"ER26-2739-002 Commission Order/Opinion 196 FERC ¶ 61,140","publishedAt":"2026-08-18","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260818-3043"},{"id":"ferc-commission-20260818-3042","accession":"20260818-3042","docket":"ER19-13-000","dockets":["ER19-13-000","ER19-1816-000","ER20-2265-000","ER24-529-000","ER26-2970-000","ER26-631-000","ER26-2972-000","ER26-2969-000","ER25-624-000","ER19-13-014"],"caseNo":"ER19-13-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-18","citation":"196 FERC ¶ 61,141","institution":"Letter order approving Pacific Gas and Electric Company's 06/26/2026 filing of an Offer of Settlement addressing all of the issues set for hearing in its Rate Year 2022 annual update etc.","library":"Electric","title":"ER19-13-000 Commission Order/Opinion 196 FERC ¶ 61,141","publishedAt":"2026-08-18","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260818-3042"},{"id":"ferc-commission-20260817-3067","accession":"20260817-3067","docket":"RM22-5-001","dockets":["RM22-5-001","RM21-15-001"],"caseNo":"RM22-5-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-17","citation":"196 FERC ¶ 61,136","institution":"Rate Recovery, Reporting, and Accounting Treatment of Industry Association Dues and Certain Civic, Political, and Related Expenses et al.","library":"ElectricRulemaking","title":"RM22-5-001 Commission Order/Opinion 196 FERC ¶ 61,136","publishedAt":"2026-08-17","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260817-3067"},{"id":"ferc-commission-20260817-3044","accession":"20260817-3044","docket":"EL26-64-000","dockets":["EL26-64-000"],"caseNo":"EL26-64-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-17","citation":"196 FERC ¶ 61,138","institution":"PowerConneX New Albany, LLC et al.","library":"Electric","title":"EL26-64-000 Commission Order/Opinion 196 FERC ¶ 61,138","publishedAt":"2026-08-17","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260817-3044"},{"id":"ferc-commission-20260817-3043","accession":"20260817-3043","docket":"RP25-936-008","dockets":["RP25-936-008","RP25-936-000","RP24-971-000"],"caseNo":"RP25-936-008","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-17","citation":"196 FERC ¶ 61,137","institution":"Vector Pipeline L.P.","library":"Gas","title":"RP25-936-008 Commission Order/Opinion 196 FERC ¶ 61,137","publishedAt":"2026-08-17","page":13,"before":"ferc-commission-20260820-3057","paidUrl":"/ferc-issuances?id=ferc-commission-20260817-3043"},{"id":"ferc-commission-20260814-3087","accession":"20260814-3087","docket":"ER26-1538-000","dockets":["ER26-1538-000","ER26-1538-001","ER26-1676-000","ER26-1676-001","ER26-1761-000","ER26-1761-001","ER26-1683-001","ER26-1765-000","ER26-1765-001","ER26-1804-001","ER26-1851-001"],"caseNo":"ER26-1538-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,134","institution":"Midcontinent Independent System Operator, Inc. et al.","library":"Electric","title":"ER26-1538-000 Commission Order/Opinion 196 FERC ¶ 61,134","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3087"},{"id":"ferc-commission-20260814-3083","accession":"20260814-3083","docket":"ER26-1929-000","dockets":["ER26-1929-000","ER26-1929-001"],"caseNo":"ER26-1929-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,127","institution":"Tri-State Generation and Transmission Association, Inc.","library":"Electric","title":"ER26-1929-000 Commission Order/Opinion 196 FERC ¶ 61,127","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3083"},{"id":"ferc-commission-20260814-3068","accession":"20260814-3068","docket":"EL26-69-000","dockets":["EL26-69-000"],"caseNo":"EL26-69-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,130","institution":"Letter order granting New York Independent System Operator, Inc.'s et al. 08/03/2026 filing of an abeyance motions to hold this proceeding in abeyance for 90 days","library":"Electric","title":"EL26-69-000 Commission Order/Opinion 196 FERC ¶ 61,130","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3068"},{"id":"ferc-commission-20260814-3061","accession":"20260814-3061","docket":"EL26-71-000","dockets":["EL26-71-000"],"caseNo":"EL26-71-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,131","institution":"California Independent System Operator Corporation et al.","library":"Electric","title":"EL26-71-000 Commission Order/Opinion 196 FERC ¶ 61,131","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3061"},{"id":"ferc-commission-20260814-3060","accession":"20260814-3060","docket":"EL26-68-000","dockets":["EL26-68-000"],"caseNo":"EL26-68-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,128","institution":"Letter order granting Southwest Power Pool, Inc.'s 08/03/2026 filing of an Abeyance Motion to hold this proceeding in abeyance until 11/20/2026","library":"Electric","title":"EL26-68-000 Commission Order/Opinion 196 FERC ¶ 61,128","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3060"},{"id":"ferc-commission-20260814-3059","accession":"20260814-3059","docket":"EL26-67-000","dockets":["EL26-67-000"],"caseNo":"EL26-67-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,129","institution":"Letter order granting PJM Interconnection, L.L.C.s et al. 07/28/2026 filing of an Abeyance Motion to hold this proceeding in abeyance for 90 days","library":"Electric","title":"EL26-67-000 Commission Order/Opinion 196 FERC ¶ 61,129","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3059"},{"id":"ferc-commission-20260814-3058","accession":"20260814-3058","docket":"EL26-70-000","dockets":["EL26-70-000"],"caseNo":"EL26-70-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,133","institution":"Letter order granting Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 filing of Abeyance Motion to hold this proceeding in abeyance for 90 days","library":"Electric","title":"EL26-70-000 Commission Order/Opinion 196 FERC ¶ 61,133","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3058"},{"id":"ferc-commission-20260814-3056","accession":"20260814-3056","docket":"EL26-72-000","dockets":["EL26-72-000"],"caseNo":"EL26-72-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-14","citation":"196 FERC ¶ 61,132","institution":"Letter order granting ISO New England Inc.'s et al. 08/03/2026 filing of the Abeyance Motion to hold this proceeding in abeyance for 90 days","library":"Electric","title":"EL26-72-000 Commission Order/Opinion 196 FERC ¶ 61,132","publishedAt":"2026-08-14","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260814-3056"},{"id":"ferc-commission-20260813-3104","accession":"20260813-3104","docket":"ER18-280-011","dockets":["ER18-280-011","ER18-577-003","ER18-280-012","ER18-577-002"],"caseNo":"ER18-280-011","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-13","citation":"196 FERC ¶ 61,125","institution":"Lee County Generating Station, LLC et al.","library":"Electric","title":"ER18-280-011 Commission Order/Opinion 196 FERC ¶ 61,125","publishedAt":"2026-08-13","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260813-3104"},{"id":"ferc-commission-20260813-3103","accession":"20260813-3103","docket":"EL26-75-000","dockets":["EL26-75-000"],"caseNo":"EL26-75-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-13","citation":"196 FERC ¶ 61,121","institution":"Union Savings Bank v. ISO New England Inc.","library":"Electric","title":"EL26-75-000 Commission Order/Opinion 196 FERC ¶ 61,121","publishedAt":"2026-08-13","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260813-3103"},{"id":"ferc-commission-20260813-3102","accession":"20260813-3102","docket":"EC26-83-000","dockets":["EC26-83-000"],"caseNo":"EC26-83-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-13","citation":"196 FERC ¶ 61,126","institution":"Tait Electric Generating Station, LLC et al.","library":"Electric","title":"EC26-83-000 Commission Order/Opinion 196 FERC ¶ 61,126","publishedAt":"2026-08-13","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260813-3102"},{"id":"ferc-commission-20260813-3049","accession":"20260813-3049","docket":"CP26-45-000","dockets":["CP26-45-000"],"caseNo":"CP26-45-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-13","citation":"196 FERC ¶ 61,124","institution":"Egan Hub Storage, LLC","library":"Gas","title":"CP26-45-000 Commission Order/Opinion 196 FERC ¶ 61,124","publishedAt":"2026-08-13","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260813-3049"},{"id":"ferc-commission-20260813-3026","accession":"20260813-3026","docket":"EL26-70-000","dockets":["EL26-70-000"],"caseNo":"EL26-70-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-13","citation":"196 FERC ¶ 61,123","institution":"Midcontinent Independent System Operator, Inc. et al.","library":"Electric","title":"EL26-70-000 Commission Order/Opinion 196 FERC ¶ 61,123","publishedAt":"2026-08-13","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260813-3026"},{"id":"ferc-commission-20260813-3025","accession":"20260813-3025","docket":"EL26-67-000","dockets":["EL26-67-000"],"caseNo":"EL26-67-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-13","citation":"196 FERC ¶ 61,122","institution":"PJM Interconnection, L.L.C. et al.","library":"Electric","title":"EL26-67-000 Commission Order/Opinion 196 FERC ¶ 61,122","publishedAt":"2026-08-13","page":14,"before":"ferc-commission-20260817-3044","paidUrl":"/ferc-issuances?id=ferc-commission-20260813-3025"},{"id":"ferc-commission-20260810-3112","accession":"20260810-3112","docket":"ER26-2789-000","dockets":["ER26-2789-000"],"caseNo":"ER26-2789-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-10","citation":"196 FERC ¶ 61,120","institution":"California Independent System Operator Corporation","library":"Electric","title":"ER26-2789-000 Commission Order/Opinion 196 FERC ¶ 61,120","publishedAt":"2026-08-10","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260810-3112"},{"id":"ferc-commission-20260810-3098","accession":"20260810-3098","docket":"ER25-1892-001","dockets":["ER25-1892-001"],"caseNo":"ER25-1892-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-10","citation":"196 FERC ¶ 61,118","institution":"Midcontinent Independent System Operator, Inc.","library":"Electric","title":"ER25-1892-001 Commission Order/Opinion 196 FERC ¶ 61,118","publishedAt":"2026-08-10","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260810-3098"},{"id":"ferc-commission-20260810-3046","accession":"20260810-3046","docket":"ER23-1760-002","dockets":["ER23-1760-002","ER23-1760-000"],"caseNo":"ER23-1760-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-10","citation":"196 FERC ¶ 61,119","institution":"Guernsey Power Station LLC","library":"Electric","title":"ER23-1760-002 Commission Order/Opinion 196 FERC ¶ 61,119","publishedAt":"2026-08-10","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260810-3046"},{"id":"ferc-commission-20260807-3070","accession":"20260807-3070","docket":"EL26-26-000","dockets":["EL26-26-000","EL26-35-000"],"caseNo":"EL26-26-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-07","citation":"196 FERC ¶ 61,112","institution":"Pelican Power LLC et al. v. Midcontinent Independent System Operator, Inc.","library":"Electric","title":"EL26-26-000 Commission Order/Opinion 196 FERC ¶ 61,112","publishedAt":"2026-08-07","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260807-3070"},{"id":"ferc-commission-20260807-3065","accession":"20260807-3065","docket":"ER26-550-001","dockets":["ER26-550-001"],"caseNo":"ER26-550-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-07","citation":"196 FERC ¶ 61,117","institution":"Duke Energy Carolinas, LLC","library":"Electric","title":"ER26-550-001 Commission Order/Opinion 196 FERC ¶ 61,117","publishedAt":"2026-08-07","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260807-3065"},{"id":"ferc-commission-20260807-3041","accession":"20260807-3041","docket":"ER26-1128-001","dockets":["ER26-1128-001"],"caseNo":"ER26-1128-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-07","citation":"196 FERC ¶ 61,111","institution":"North Rosamond Solar, LLC","library":"Electric","title":"ER26-1128-001 Commission Order/Opinion 196 FERC ¶ 61,111","publishedAt":"2026-08-07","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260807-3041"},{"id":"ferc-commission-20260807-3037","accession":"20260807-3037","docket":"ER18-2511-011","dockets":["ER18-2511-011","EL26-89-000"],"caseNo":"ER18-2511-011","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-07","citation":"196 FERC ¶ 61,113","institution":"NorthWestern Corporation","library":"Electric","title":"ER18-2511-011 Commission Order/Opinion 196 FERC ¶ 61,113","publishedAt":"2026-08-07","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260807-3037"},{"id":"ferc-commission-20260807-3031","accession":"20260807-3031","docket":"ER23-2979-002","dockets":["ER23-2979-002","ER23-2979-000","EL24-24-000"],"caseNo":"ER23-2979-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-07","citation":"196 FERC ¶ 61,116","institution":"Letter order approving CPV Maple Hill Solar, LLC's 08/27/2024 filing of an Offer of Settlement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service","library":"Electric","title":"ER23-2979-002 Commission Order/Opinion 196 FERC ¶ 61,116","publishedAt":"2026-08-07","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260807-3031"},{"id":"ferc-commission-20260807-3026","accession":"20260807-3026","docket":"ER23-1752-006","dockets":["ER23-1752-006","ER23-1752-004","ER23-1752-000","EL24-63-000"],"caseNo":"ER23-1752-006","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-07","citation":"196 FERC ¶ 61,115","institution":"Letter order approving Oak Trail Solar, LLC's 07/12/2024 filing of a Joint Offer of Settlement and Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"ER23-1752-006 Commission Order/Opinion 196 FERC ¶ 61,115","publishedAt":"2026-08-07","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260807-3026"},{"id":"ferc-commission-20260807-3025","accession":"20260807-3025","docket":"ER18-92-008","dockets":["ER18-92-008","ER18-92-000","EL25-113-000"],"caseNo":"ER18-92-008","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-07","citation":"196 FERC ¶ 61,114","institution":"Letter order approving Carroll County Energy LLC's 05/12/2026 filing of a Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"ER18-92-008 Commission Order/Opinion 196 FERC ¶ 61,114","publishedAt":"2026-08-07","page":15,"before":"ferc-commission-20260813-3025","paidUrl":"/ferc-issuances?id=ferc-commission-20260807-3025"},{"id":"ferc-commission-20260806-3064","accession":"20260806-3064","docket":"ER20-1050-001","dockets":["ER20-1050-001","ER20-1050-000"],"caseNo":"ER20-1050-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-06","citation":"196 FERC ¶ 61,109","institution":"Letter order accepting GridLiance Heartland LLC's 02/21/2020, as amended on 03/27/2026, filing of revisions to its Annual Transmission Revenue Requirement formula rate template and implementation protocols etc.","library":"Electric","title":"ER20-1050-001 Commission Order/Opinion 196 FERC ¶ 61,109","publishedAt":"2026-08-06","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260806-3064"},{"id":"ferc-commission-20260805-3047","accession":"20260805-3047","docket":"EC26-63-000","dockets":["EC26-63-000"],"caseNo":"EC26-63-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-05","citation":"196 FERC ¶ 61,107","institution":"Bridgeport Energy LLC et al.","library":"Electric","title":"EC26-63-000 Commission Order/Opinion 196 FERC ¶ 61,107","publishedAt":"2026-08-05","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260805-3047"},{"id":"ferc-commission-20260805-3042","accession":"20260805-3042","docket":"ER26-1915-001","dockets":["ER26-1915-001"],"caseNo":"ER26-1915-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-05","citation":"196 FERC ¶ 61,108","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 03/25/2026, as amended on 06/11/2026, filing of proposed revisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff etc.","library":"Electric","title":"ER26-1915-001 Commission Order/Opinion 196 FERC ¶ 61,108","publishedAt":"2026-08-05","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260805-3042"},{"id":"ferc-commission-20260804-3090","accession":"20260804-3090","docket":"ER26-1020-001","dockets":["ER26-1020-001"],"caseNo":"ER26-1020-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-04","citation":"196 FERC ¶ 61,106","institution":"Murphy Solar, LLC et al.","library":"Electric","title":"ER26-1020-001 Commission Order/Opinion 196 FERC ¶ 61,106","publishedAt":"2026-08-04","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260804-3090"},{"id":"ferc-commission-20260804-3088","accession":"20260804-3088","docket":"ER26-2747-000","dockets":["ER26-2747-000"],"caseNo":"ER26-2747-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-04","citation":"196 FERC ¶ 61,101","institution":"California Independent System Operator Corporation","library":"Electric","title":"ER26-2747-000 Commission Order/Opinion 196 FERC ¶ 61,101","publishedAt":"2026-08-04","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260804-3088"},{"id":"ferc-commission-20260804-3056","accession":"20260804-3056","docket":"ER26-2744-000","dockets":["ER26-2744-000"],"caseNo":"ER26-2744-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-04","citation":"196 FERC ¶ 61,102","institution":"Ameren Transmission Company of Illinois et al.","library":"Electric","title":"ER26-2744-000 Commission Order/Opinion 196 FERC ¶ 61,102","publishedAt":"2026-08-04","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260804-3056"},{"id":"ferc-commission-20260804-3051","accession":"20260804-3051","docket":"ER26-1564-000","dockets":["ER26-1564-000","ER26-1564-001"],"caseNo":"ER26-1564-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-04","citation":"196 FERC ¶ 61,104","institution":"Entergy Arkansas, LLC et al.","library":"Electric","title":"ER26-1564-000 Commission Order/Opinion 196 FERC ¶ 61,104","publishedAt":"2026-08-04","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260804-3051"},{"id":"ferc-commission-20260804-3033","accession":"20260804-3033","docket":"ER26-1986-001","dockets":["ER26-1986-001"],"caseNo":"ER26-1986-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-04","citation":"196 FERC ¶ 61,105","institution":"Duke Energy Carolinas, LLC et al.","library":"Electric","title":"ER26-1986-001 Commission Order/Opinion 196 FERC ¶ 61,105","publishedAt":"2026-08-04","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260804-3033"},{"id":"ferc-commission-20260804-3019","accession":"20260804-3019","docket":"ER26-2743-000","dockets":["ER26-2743-000"],"caseNo":"ER26-2743-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-04","citation":"196 FERC ¶ 61,103","institution":"GridLiance Heartland LLC et al.","library":"Electric","title":"ER26-2743-000 Commission Order/Opinion 196 FERC ¶ 61,103","publishedAt":"2026-08-04","page":16,"before":"ferc-commission-20260807-3026","paidUrl":"/ferc-issuances?id=ferc-commission-20260804-3019"},{"id":"ferc-commission-20260803-3061","accession":"20260803-3061","docket":"RP26-950-000","dockets":["RP26-950-000"],"caseNo":"RP26-950-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-03","citation":"196 FERC ¶ 61,097","institution":"HE&D Offshore, L.P. et al.","library":"Gas","title":"RP26-950-000 Commission Order/Opinion 196 FERC ¶ 61,097","publishedAt":"2026-08-03","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260803-3061"},{"id":"ferc-commission-20260803-3060","accession":"20260803-3060","docket":"ER26-2738-000","dockets":["ER26-2738-000"],"caseNo":"ER26-2738-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-03","citation":"196 FERC ¶ 61,098","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-2738-000 Commission Order/Opinion 196 FERC ¶ 61,098","publishedAt":"2026-08-03","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260803-3060"},{"id":"ferc-commission-20260803-3059","accession":"20260803-3059","docket":"RP25-844-006","dockets":["RP25-844-006","RP25-844-000"],"caseNo":"RP25-844-006","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-03","citation":"196 FERC ¶ 61,094","institution":"Letter order approving East Tennessee Natural Gas, LLC's 05/29/2026 filing of a stipulation and agreement etc.","library":"Gas","title":"RP25-844-006 Commission Order/Opinion 196 FERC ¶ 61,094","publishedAt":"2026-08-03","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260803-3059"},{"id":"ferc-commission-20260803-3029","accession":"20260803-3029","docket":"ER26-2705-000","dockets":["ER26-2705-000"],"caseNo":"ER26-2705-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-03","citation":"196 FERC ¶ 61,099","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 06/01/2026 filing of proposed revisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff etc.","library":"Electric","title":"ER26-2705-000 Commission Order/Opinion 196 FERC ¶ 61,099","publishedAt":"2026-08-03","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260803-3029"},{"id":"ferc-commission-20260803-3012","accession":"20260803-3012","docket":"EL26-36-001","dockets":["EL26-36-001"],"caseNo":"EL26-36-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-03","citation":"196 FERC ¶ 61,095","institution":"Northern Indiana Public Service Company LLC v. Midcontinent Independent System Operator, Inc.","library":"Electric","title":"EL26-36-001 Commission Order/Opinion 196 FERC ¶ 61,095","publishedAt":"2026-08-03","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260803-3012"},{"id":"ferc-commission-20260803-3003","accession":"20260803-3003","docket":"EL26-38-001","dockets":["EL26-38-001"],"caseNo":"EL26-38-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-08-03","citation":"196 FERC ¶ 61,096","institution":"Southern Indiana Gas and Electric Company v. Midcontinent Independent System Operator, Inc.","library":"Electric","title":"EL26-38-001 Commission Order/Opinion 196 FERC ¶ 61,096","publishedAt":"2026-08-03","page":17,"before":"ferc-commission-20260804-3033","paidUrl":"/ferc-issuances?id=ferc-commission-20260803-3003"},{"id":"ferc-commission-20260731-3085","accession":"20260731-3085","docket":"CP25-514-000","dockets":["CP25-514-000","CP25-517-000"],"caseNo":"CP25-514-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,093","institution":"Tennessee Gas Pipeline Company, L.L.C.'s et al. Mississippi Crossing Project et al.","library":"Gas","title":"CP25-514-000 Commission Order/Opinion 196 FERC ¶ 61,093","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3085"},{"id":"ferc-commission-20260731-3065","accession":"20260731-3065","docket":"ER26-2616-000","dockets":["ER26-2616-000"],"caseNo":"ER26-2616-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,090","institution":"Southwest Power Pool, Inc. et al.","library":"Electric","title":"ER26-2616-000 Commission Order/Opinion 196 FERC ¶ 61,090","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3065"},{"id":"ferc-commission-20260731-3059","accession":"20260731-3059","docket":"ER26-2593-000","dockets":["ER26-2593-000"],"caseNo":"ER26-2593-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,087","institution":"Cordova Energy Company LLC et al.","library":"Electric","title":"ER26-2593-000 Commission Order/Opinion 196 FERC ¶ 61,087","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3059"},{"id":"ferc-commission-20260731-3056","accession":"20260731-3056","docket":"ER26-2735-000","dockets":["ER26-2735-000"],"caseNo":"ER26-2735-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,085","institution":"Vermont Transco LLC","library":"Electric","title":"ER26-2735-000 Commission Order/Opinion 196 FERC ¶ 61,085","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3056"},{"id":"ferc-commission-20260731-3035","accession":"20260731-3035","docket":"RP26-939-000","dockets":["RP26-939-000"],"caseNo":"RP26-939-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,089","institution":"Eastern Gas Transmission and Storage, Inc.","library":"Gas","title":"RP26-939-000 Commission Order/Opinion 196 FERC ¶ 61,089","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3035"},{"id":"ferc-commission-20260731-3032","accession":"20260731-3032","docket":"EL26-53-000","dockets":["EL26-53-000"],"caseNo":"EL26-53-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,091","institution":"ALLETE, Inc.","library":"Electric","title":"EL26-53-000 Commission Order/Opinion 196 FERC ¶ 61,091","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3032"},{"id":"ferc-commission-20260731-3022","accession":"20260731-3022","docket":"EL15-3-008","dockets":["EL15-3-008"],"caseNo":"EL15-3-008","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,086","institution":"City and County of San Francisco v. Pacific Gas and Electric Company","library":"Electric","title":"EL15-3-008 Commission Order/Opinion 196 FERC ¶ 61,086","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3022"},{"id":"ferc-commission-20260731-3005","accession":"20260731-3005","docket":"RP26-963-000","dockets":["RP26-963-000"],"caseNo":"RP26-963-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-31","citation":"196 FERC ¶ 61,088","institution":"Trailblazer Pipeline Company LLC","library":"Gas","title":"RP26-963-000 Commission Order/Opinion 196 FERC ¶ 61,088","publishedAt":"2026-07-31","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260731-3005"},{"id":"ferc-commission-20260730-3048","accession":"20260730-3048","docket":"EC26-81-000","dockets":["EC26-81-000","EC26-82-000"],"caseNo":"EC26-81-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,081","institution":"AEP Generation Resources Inc. et al.","library":"Electric","title":"EC26-81-000 Commission Order/Opinion 196 FERC ¶ 61,081","publishedAt":"2026-07-30","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3048"},{"id":"ferc-commission-20260730-3047","accession":"20260730-3047","docket":"ER26-2706-000","dockets":["ER26-2706-000"],"caseNo":"ER26-2706-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,080","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 06/01/2026 filing of proposed revisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff to modify its methodology etc.","library":"Electric","title":"ER26-2706-000 Commission Order/Opinion 196 FERC ¶ 61,080","publishedAt":"2026-07-30","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3047"},{"id":"ferc-commission-20260730-3042","accession":"20260730-3042","docket":"ER20-2819-002","dockets":["ER20-2819-002","EL21-10-000","ER21-350-000","ER21-521-002","ER21-521-000","ER21-2474-002","ER20-2819-000","ER21-350-002","EL21-31-000","EL21-25-000","ER21-2474-000","EL21-101-000"],"caseNo":"ER20-2819-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,084","institution":"Pleinmont Solar 1, LLC et al.","library":"Electric","title":"ER20-2819-002 Commission Order/Opinion 196 FERC ¶ 61,084","publishedAt":"2026-07-30","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3042"},{"id":"ferc-commission-20260730-3038","accession":"20260730-3038","docket":"EL24-139-000","dockets":["EL24-139-000","ER24-1929-003","ER24-1929-000"],"caseNo":"EL24-139-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,082","institution":"Letter order approving Willowbrook Solar I, LLC's 02/07/2025 filing of a Joint Offer of Settlement and Settlement Agreement addressing its rate schedule for providing Reactive Supply and Voltage Control etc.","library":"Electric","title":"EL24-139-000 Commission Order/Opinion 196 FERC ¶ 61,082","publishedAt":"2026-07-30","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3038"},{"id":"ferc-commission-20260730-3037","accession":"20260730-3037","docket":"ER16-1530-000","dockets":["ER16-1530-000","ER16-1530-005","EL25-38-000","ER20-2446-008","EL25-39-000","ER21-887-004","EL25-40-000","ER20-2446-000","ER21-887-000"],"caseNo":"ER16-1530-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,083","institution":"Letter order approving BIF III Holtwood LLC's et al. 03/13/2025 filing of an Offer of Settlement addressing the rate schedules for providing Reactive Supply and Voltage Control etc.","library":"Electric","title":"ER16-1530-000 Commission Order/Opinion 196 FERC ¶ 61,083","publishedAt":"2026-07-30","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3037"},{"id":"ferc-commission-20260730-3034","accession":"20260730-3034","docket":"ER22-285-001","dockets":["ER22-285-001","ER22-294-001","ER22-279-001","ER22-279-000","ER22-285-000","ER22-294-000"],"caseNo":"ER22-285-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,077","institution":"Parkway Generation Keys Energy Center LLC et al.","library":"Electric","title":"ER22-285-001 Commission Order/Opinion 196 FERC ¶ 61,077","publishedAt":"2026-07-30","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3034"},{"id":"ferc-commission-20260730-3029","accession":"20260730-3029","docket":"ER23-982-002","dockets":["ER23-982-002","ER23-982-000","EL23-47-000"],"caseNo":"ER23-982-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,078","institution":"CPV Three Rivers, LLC","library":"Electric","title":"ER23-982-002 Commission Order/Opinion 196 FERC ¶ 61,078","publishedAt":"2026-07-30","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3029"},{"id":"ferc-commission-20260730-3028","accession":"20260730-3028","docket":"ER22-351-000","dockets":["ER22-351-000","ER22-351-001"],"caseNo":"ER22-351-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,079","institution":"PSEG Energy Resources & Trade, LLC","library":"Electric","title":"ER22-351-000 Commission Order/Opinion 196 FERC ¶ 61,079","publishedAt":"2026-07-30","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3028"},{"id":"ferc-commission-20260730-3023","accession":"20260730-3023","docket":"ER21-2460-000","dockets":["ER21-2460-000"],"caseNo":"ER21-2460-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-30","citation":"196 FERC ¶ 61,076","institution":"Letter order granting New York Independent System Operator, Inc.'s 04/15/2026 filing of a motion in the above-captioned proceeding seeking to defer the effective date of its previously accepted tariff revisions etc.","library":"Electric","title":"ER21-2460-000 Commission Order/Opinion 196 FERC ¶ 61,076","publishedAt":"2026-07-30","page":18,"before":"ferc-commission-20260803-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260730-3023"},{"id":"ferc-commission-20260729-3077","accession":"20260729-3077","docket":"EL26-4-000","dockets":["EL26-4-000"],"caseNo":"EL26-4-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-29","citation":"196 FERC ¶ 61,074","institution":"Voltus, Inc., et al. v. PJM Interconnection, L.L.C.","library":"Electric","title":"EL26-4-000 Commission Order/Opinion 196 FERC ¶ 61,074","publishedAt":"2026-07-29","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260729-3077"},{"id":"ferc-commission-20260729-3047","accession":"20260729-3047","docket":"EC26-58-000","dockets":["EC26-58-000"],"caseNo":"EC26-58-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-29","citation":"196 FERC ¶ 61,075","institution":"Morgantown Power, LLC","library":"Electric","title":"EC26-58-000 Commission Order/Opinion 196 FERC ¶ 61,075","publishedAt":"2026-07-29","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260729-3047"},{"id":"ferc-commission-20260728-3057","accession":"20260728-3057","docket":"ER26-2698-000","dockets":["ER26-2698-000"],"caseNo":"ER26-2698-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-28","citation":"196 FERC ¶ 61,073","institution":"New York Independent System Operator, Inc.","library":"Electric","title":"ER26-2698-000 Commission Order/Opinion 196 FERC ¶ 61,073","publishedAt":"2026-07-28","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260728-3057"},{"id":"ferc-commission-20260728-3036","accession":"20260728-3036","docket":"ER26-2779-000","dockets":["ER26-2779-000"],"caseNo":"ER26-2779-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-28","citation":"196 FERC ¶ 61,071","institution":"Silver Star Solar I, LLC","library":"Electric","title":"ER26-2779-000 Commission Order/Opinion 196 FERC ¶ 61,071","publishedAt":"2026-07-28","page":19,"before":"ferc-commission-20260730-3028","paidUrl":"/ferc-issuances?id=ferc-commission-20260728-3036"},{"id":"ferc-commission-20260727-3082","accession":"20260727-3082","docket":"ER26-2665-000","dockets":["ER26-2665-000"],"caseNo":"ER26-2665-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-27","citation":"196 FERC ¶ 61,068","institution":"LS Power Grid California, LLC","library":"Electric","title":"ER26-2665-000 Commission Order/Opinion 196 FERC ¶ 61,068","publishedAt":"2026-07-27","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260727-3082"},{"id":"ferc-commission-20260727-3065","accession":"20260727-3065","docket":"RP25-858-005","dockets":["RP25-858-005","RP25-858-000"],"caseNo":"RP25-858-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-27","citation":"196 FERC ¶ 61,069","institution":"Letter order approving ANR Pipeline Company's 05/11/2026 filing of a settlement etc.","library":"Gas","title":"RP25-858-005 Commission Order/Opinion 196 FERC ¶ 61,069","publishedAt":"2026-07-27","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260727-3065"},{"id":"ferc-commission-20260724-3067","accession":"20260724-3067","docket":"ER26-2703-000","dockets":["ER26-2703-000"],"caseNo":"ER26-2703-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-24","citation":"196 FERC ¶ 61,061","institution":"Letter order approving Central Nebraska Public Power and Irrigation District's 06/01/2026 filing of a Stipulation and Offer of Settlement","library":"Electric","title":"ER26-2703-000 Commission Order/Opinion 196 FERC ¶ 61,061","publishedAt":"2026-07-24","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260724-3067"},{"id":"ferc-commission-20260724-3065","accession":"20260724-3065","docket":"EL25-57-000","dockets":["EL25-57-000"],"caseNo":"EL25-57-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-24","citation":"196 FERC ¶ 61,064","institution":"Pluvia LLC","library":"Electric","title":"EL25-57-000 Commission Order/Opinion 196 FERC ¶ 61,064","publishedAt":"2026-07-24","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260724-3065"},{"id":"ferc-commission-20260724-3050","accession":"20260724-3050","docket":"IN79-6-000","dockets":["IN79-6-000"],"caseNo":"IN79-6-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-24","citation":"196 FERC ¶ 61,066","institution":"Letter order granting Sierra Pacific Power Company's 05/22/2026 filing of a request for partial waiver of the requirement to respond to the 2026 FERC Form 580 Interrogatory on Fuel and Energy Purchase Practices","library":"Electric","title":"IN79-6-000 Commission Order/Opinion 196 FERC ¶ 61,066","publishedAt":"2026-07-24","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260724-3050"},{"id":"ferc-commission-20260724-3047","accession":"20260724-3047","docket":"ER26-2644-000","dockets":["ER26-2644-000","ER26-2643-000"],"caseNo":"ER26-2644-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-24","citation":"196 FERC ¶ 61,063","institution":"DESRI Carne Interconnection, L.L.C. et al.","library":"Electric","title":"ER26-2644-000 Commission Order/Opinion 196 FERC ¶ 61,063","publishedAt":"2026-07-24","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260724-3047"},{"id":"ferc-commission-20260724-3044","accession":"20260724-3044","docket":"ER26-2651-000","dockets":["ER26-2651-000"],"caseNo":"ER26-2651-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-24","citation":"196 FERC ¶ 61,062","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-2651-000 Commission Order/Opinion 196 FERC ¶ 61,062","publishedAt":"2026-07-24","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260724-3044"},{"id":"ferc-commission-20260724-3030","accession":"20260724-3030","docket":"ER26-2245-001","dockets":["ER26-2245-001","ER26-2245-002"],"caseNo":"ER26-2245-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-24","citation":"196 FERC ¶ 61,065","institution":"Letter order accepting Tucson Electric Power Company's 04/17/2026, as amended on 05/11/2026 and 06/18/2026, filing of proposed revisions to Attachment C, Attachment C-1, Attachment D, and Attachment K etc.","library":"Electric","title":"ER26-2245-001 Commission Order/Opinion 196 FERC ¶ 61,065","publishedAt":"2026-07-24","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260724-3030"},{"id":"ferc-commission-20260723-3053","accession":"20260723-3053","docket":"ER26-2595-000","dockets":["ER26-2595-000"],"caseNo":"ER26-2595-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-23","citation":"196 FERC ¶ 61,060","institution":"Letter order accepting California Independent System Operator Corporation's 05/21/2026 filing of a Multilateral Variable Energy Resource Agreement dated 04/23/2026 with SunZia Wind North, LLC and SunZia Wind South, LLC","library":"Electric","title":"ER26-2595-000 Commission Order/Opinion 196 FERC ¶ 61,060","publishedAt":"2026-07-23","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260723-3053"},{"id":"ferc-commission-20260723-3014","accession":"20260723-3014","docket":"ER17-1609-006","dockets":["ER17-1609-006","ER19-1215-003","ER20-2667-002"],"caseNo":"ER17-1609-006","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-23","citation":"196 FERC ¶ 61,056","institution":"Carroll County Energy LLC et al.","library":"Electric","title":"ER17-1609-006 Commission Order/Opinion 196 FERC ¶ 61,056","publishedAt":"2026-07-23","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260723-3014"},{"id":"ferc-commission-20260723-3008","accession":"20260723-3008","docket":"ER20-2576-006","dockets":["ER20-2576-006","ER20-2576-000","EL25-103-000"],"caseNo":"ER20-2576-006","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-23","citation":"196 FERC ¶ 61,058","institution":"Letter order approving Aulander Holloman Solar, LLC's 09/19/2025 filing of a Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service","library":"Electric","title":"ER20-2576-006 Commission Order/Opinion 196 FERC ¶ 61,058","publishedAt":"2026-07-23","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260723-3008"},{"id":"ferc-commission-20260723-3007","accession":"20260723-3007","docket":"ER21-21-007","dockets":["ER21-21-007","ER21-21-000","EL25-85-000"],"caseNo":"ER21-21-007","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-23","citation":"196 FERC ¶ 61,057","institution":"Letter order approving Harts Mill Solar, LLC's 01/02/2026 filing of an Offer of Settlement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service","library":"Electric","title":"ER21-21-007 Commission Order/Opinion 196 FERC ¶ 61,057","publishedAt":"2026-07-23","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260723-3007"},{"id":"ferc-commission-20260723-3006","accession":"20260723-3006","docket":"ER22-763-004","dockets":["ER22-763-004","ER22-763-000","EL25-100-000"],"caseNo":"ER22-763-004","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-23","citation":"196 FERC ¶ 61,059","institution":"Letter order approving Ranchland Solar, LLC's 10/03/2025 filing of an Offer of Settlement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service","library":"Electric","title":"ER22-763-004 Commission Order/Opinion 196 FERC ¶ 61,059","publishedAt":"2026-07-23","page":20,"before":"ferc-commission-20260728-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260723-3006"},{"id":"ferc-commission-20260722-3002","accession":"20260722-3002","docket":"ER22-967-003","dockets":["ER22-967-003","ER22-967-000"],"caseNo":"ER22-967-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-22","citation":"196 FERC ¶ 61,055","institution":"Covanta Fairfax, LLC","library":"Electric","title":"ER22-967-003 Commission Order/Opinion 196 FERC ¶ 61,055","publishedAt":"2026-07-22","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260722-3002"},{"id":"ferc-commission-20260721-3054","accession":"20260721-3054","docket":"ER26-2604-000","dockets":["ER26-2604-000"],"caseNo":"ER26-2604-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-21","citation":"196 FERC ¶ 61,053","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER26-2604-000 Commission Order/Opinion 196 FERC ¶ 61,053","publishedAt":"2026-07-21","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260721-3054"},{"id":"ferc-commission-20260721-3051","accession":"20260721-3051","docket":"ER26-2605-000","dockets":["ER26-2605-000"],"caseNo":"ER26-2605-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-21","citation":"196 FERC ¶ 61,052","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 05/22/2026 filing of an unexecuted Generator Interconnection Agreement with Swift Energy Storage, LLC and Southern Minnesota Municipal Power Agency etc.","library":"Electric","title":"ER26-2605-000 Commission Order/Opinion 196 FERC ¶ 61,052","publishedAt":"2026-07-21","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260721-3051"},{"id":"ferc-commission-20260721-3050","accession":"20260721-3050","docket":"ER26-2608-000","dockets":["ER26-2608-000"],"caseNo":"ER26-2608-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-21","citation":"196 FERC ¶ 61,054","institution":"Northern Indiana Public Service Company LLC et al.","library":"Electric","title":"ER26-2608-000 Commission Order/Opinion 196 FERC ¶ 61,054","publishedAt":"2026-07-21","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260721-3050"},{"id":"ferc-commission-20260721-3017","accession":"20260721-3017","docket":"ER26-2295-000","dockets":["ER26-2295-000","ER26-2295-001"],"caseNo":"ER26-2295-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-21","citation":"196 FERC ¶ 61,047","institution":"Lansing Board of Water and Light","library":"Electric","title":"ER26-2295-000 Commission Order/Opinion 196 FERC ¶ 61,047","publishedAt":"2026-07-21","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260721-3017"},{"id":"ferc-commission-20260720-3065","accession":"20260720-3065","docket":"ER26-2577-000","dockets":["ER26-2577-000"],"caseNo":"ER26-2577-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-20","citation":"196 FERC ¶ 61,051","institution":"Letter order accepting New York Independent System Operator, Inc.'s 05/19/2026 filing of proposed revisions to the Standard Interconnection Procedures in Attachment HH etc.","library":"Electric","title":"ER26-2577-000 Commission Order/Opinion 196 FERC ¶ 61,051","publishedAt":"2026-07-20","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260720-3065"},{"id":"ferc-commission-20260720-3064","accession":"20260720-3064","docket":"ER26-2492-000","dockets":["ER26-2492-000"],"caseNo":"ER26-2492-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-20","citation":"196 FERC ¶ 61,049","institution":"Silver Maple PV, LLC","library":"Electric","title":"ER26-2492-000 Commission Order/Opinion 196 FERC ¶ 61,049","publishedAt":"2026-07-20","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260720-3064"},{"id":"ferc-commission-20260720-3061","accession":"20260720-3061","docket":"RM23-9-001","dockets":["RM23-9-001"],"caseNo":"RM23-9-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-20","citation":"196 FERC ¶ 61,045","institution":"Filing Process and Data Collection for the Electric Quarterly Report","library":"ElectricRulemaking","title":"RM23-9-001 Commission Order/Opinion 196 FERC ¶ 61,045","publishedAt":"2026-07-20","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260720-3061"},{"id":"ferc-commission-20260720-3060","accession":"20260720-3060","docket":"IN79-6-000","dockets":["IN79-6-000"],"caseNo":"IN79-6-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-20","citation":"196 FERC ¶ 61,046","institution":"Letter order granting Pacific Gas and Electric Company's 05/21/2026 filing of a request for partial waiver of the requirement to respond to the 2026 FERC Form 580 Interrogatory on Fuel and Energy Purchase Practices","library":"Electric","title":"IN79-6-000 Commission Order/Opinion 196 FERC ¶ 61,046","publishedAt":"2026-07-20","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260720-3060"},{"id":"ferc-commission-20260720-3055","accession":"20260720-3055","docket":"ER26-344-001","dockets":["ER26-344-001","ER26-344-002"],"caseNo":"ER26-344-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-20","citation":"196 FERC ¶ 61,050","institution":"Letter order accepting Wisconsin Electric Power Company's 10/30/2025, as amended on 12/29/2025 et al. filing of revisions to Exhibit B and a new Exhibit D to its Formula Rate Wholesale Sales Tariff etc.","library":"Electric","title":"ER26-344-001 Commission Order/Opinion 196 FERC ¶ 61,050","publishedAt":"2026-07-20","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260720-3055"},{"id":"ferc-commission-20260720-3007","accession":"20260720-3007","docket":"ER26-2523-000","dockets":["ER26-2523-000"],"caseNo":"ER26-2523-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-20","citation":"196 FERC ¶ 61,043","institution":"California Grid Holdings LLC's Manning to Metcalf 500 kV Line Project","library":"Electric","title":"ER26-2523-000 Commission Order/Opinion 196 FERC ¶ 61,043","publishedAt":"2026-07-20","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260720-3007"},{"id":"ferc-commission-20260720-3006","accession":"20260720-3006","docket":"EL26-61-000","dockets":["EL26-61-000"],"caseNo":"EL26-61-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-20","citation":"196 FERC ¶ 61,044","institution":"TWPR Banking Intermediary Trust v. Duke Energy Carolinas, LLC","library":"Electric","title":"EL26-61-000 Commission Order/Opinion 196 FERC ¶ 61,044","publishedAt":"2026-07-20","page":21,"before":"ferc-commission-20260723-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260720-3006"},{"id":"ferc-commission-20260717-3026","accession":"20260717-3026","docket":"ER26-2615-000","dockets":["ER26-2615-000"],"caseNo":"ER26-2615-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-17","citation":"196 FERC ¶ 61,042","institution":"Commonwealth Edison Company","library":"Electric","title":"ER26-2615-000 Commission Order/Opinion 196 FERC ¶ 61,042","publishedAt":"2026-07-17","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260717-3026"},{"id":"ferc-commission-20260717-3025","accession":"20260717-3025","docket":"ER26-2566-000","dockets":["ER26-2566-000"],"caseNo":"ER26-2566-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-17","citation":"196 FERC ¶ 61,040","institution":"Commonwealth Edison Company","library":"Electric","title":"ER26-2566-000 Commission Order/Opinion 196 FERC ¶ 61,040","publishedAt":"2026-07-17","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260717-3025"},{"id":"ferc-commission-20260717-3022","accession":"20260717-3022","docket":"ER26-1946-001","dockets":["ER26-1946-001"],"caseNo":"ER26-1946-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-17","citation":"196 FERC ¶ 61,041","institution":"Midcontinent Independent System Operator, Inc.","library":"Electric","title":"ER26-1946-001 Commission Order/Opinion 196 FERC ¶ 61,041","publishedAt":"2026-07-17","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260717-3022"},{"id":"ferc-commission-20260716-3111","accession":"20260716-3111","docket":"RP26-768-000","dockets":["RP26-768-000"],"caseNo":"RP26-768-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,039","institution":"Port Arthur LNG, LLC","library":"Gas","title":"RP26-768-000 Commission Order/Opinion 196 FERC ¶ 61,039","publishedAt":"2026-07-16","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3111"},{"id":"ferc-commission-20260716-3110","accession":"20260716-3110","docket":"RP23-1099-008","dockets":["RP23-1099-008"],"caseNo":"RP23-1099-008","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,038","institution":"Gas Transmission Northwest LLC","library":"Gas","title":"RP23-1099-008 Commission Order/Opinion 196 FERC ¶ 61,038","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3110"},{"id":"ferc-commission-20260716-3063","accession":"20260716-3063","docket":"EL26-62-000","dockets":["EL26-62-000"],"caseNo":"EL26-62-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,036","institution":"Basin Electric Power Cooperative","library":"Electric","title":"EL26-62-000 Commission Order/Opinion 196 FERC ¶ 61,036","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3063"},{"id":"ferc-commission-20260716-3058","accession":"20260716-3058","docket":"AD26-10-000","dockets":["AD26-10-000"],"caseNo":"AD26-10-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,032","institution":"Western Seams Coordination","library":"ElectricRulemaking","title":"AD26-10-000 Commission Order/Opinion 196 FERC ¶ 61,032","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3058"},{"id":"ferc-commission-20260716-3044","accession":"20260716-3044","docket":"CX26-2-000","dockets":["CX26-2-000"],"caseNo":"CX26-2-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,037","institution":"Order Adopting Categorical Exclusions from Tennessee Valley Authority","library":"Hydro","title":"CX26-2-000 Commission Order/Opinion 196 FERC ¶ 61,037","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3044"},{"id":"ferc-commission-20260716-3043","accession":"20260716-3043","docket":"ER10-1391-004","dockets":["ER10-1391-004"],"caseNo":"ER10-1391-004","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,035","institution":"San Diego Gas & Electric","library":"Electric","title":"ER10-1391-004 Commission Order/Opinion 196 FERC ¶ 61,035","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3043"},{"id":"ferc-commission-20260716-3042","accession":"20260716-3042","docket":"ER24-2776-002","dockets":["ER24-2776-002"],"caseNo":"ER24-2776-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,033","institution":"Southern California Edison Company","library":"Electric","title":"ER24-2776-002 Commission Order/Opinion 196 FERC ¶ 61,033","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3042"},{"id":"ferc-commission-20260716-3041","accession":"20260716-3041","docket":"RD26-7-000","dockets":["RD26-7-000"],"caseNo":"RD26-7-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,031","institution":"Order Directing the North American Electric Reliability Corporation to File Reliability Standard(s) Pertaining to Computational Load Integration","library":"Electric","title":"RD26-7-000 Commission Order/Opinion 196 FERC ¶ 61,031","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3041"},{"id":"ferc-commission-20260716-3040","accession":"20260716-3040","docket":"ER24-3032-001","dockets":["ER24-3032-001"],"caseNo":"ER24-3032-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,034","institution":"Pacific Gas and Electric Company","library":"Electric","title":"ER24-3032-001 Commission Order/Opinion 196 FERC ¶ 61,034","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3040"},{"id":"ferc-commission-20260716-3039","accession":"20260716-3039","docket":"CP26-17-000","dockets":["CP26-17-000"],"caseNo":"CP26-17-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,030","institution":"Leaf River Energy Center LLC's Leaf River Expansion Project","library":"Gas","title":"CP26-17-000 Commission Order/Opinion 196 FERC ¶ 61,030","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3039"},{"id":"ferc-commission-20260716-3037","accession":"20260716-3037","docket":"RM26-7-000","dockets":["RM26-7-000"],"caseNo":"RM26-7-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,028","institution":"RIN 1902-AG50: Final Rule; Categorical Exclusion","library":"ElectricRulemaking","title":"RM26-7-000 Commission Order/Opinion 196 FERC ¶ 61,028","publishedAt":"2026-07-16","page":24,"before":"ferc-commission-20260716-3036","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3037"},{"id":"ferc-commission-20260716-3036","accession":"20260716-3036","docket":"ER17-405-000","dockets":["ER17-405-000","ER17-406-000","EL26-56-000"],"caseNo":"ER17-405-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,027","institution":"Appalachian Power Company et al.","library":"Electric","title":"ER17-405-000 Commission Order/Opinion 196 FERC ¶ 61,027","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3036"},{"id":"ferc-commission-20260716-3035","accession":"20260716-3035","docket":"ER23-2613-000","dockets":["ER23-2613-000"],"caseNo":"ER23-2613-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,025","institution":"NextEra Energy Marketing, LLC","library":"Electric","title":"ER23-2613-000 Commission Order/Opinion 196 FERC ¶ 61,025","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3035"},{"id":"ferc-commission-20260716-3033","accession":"20260716-3033","docket":"ER23-2385-000","dockets":["ER23-2385-000"],"caseNo":"ER23-2385-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,024","institution":"ConocoPhillips Company","library":"Electric","title":"ER23-2385-000 Commission Order/Opinion 196 FERC ¶ 61,024","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3033"},{"id":"ferc-commission-20260716-3032","accession":"20260716-3032","docket":"ER23-2121-000","dockets":["ER23-2121-000"],"caseNo":"ER23-2121-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,023","institution":"Freeport-McMoRan Copper & Gold Energy Services, LLC","library":"Electric","title":"ER23-2121-000 Commission Order/Opinion 196 FERC ¶ 61,023","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3032"},{"id":"ferc-commission-20260716-3031","accession":"20260716-3031","docket":"ER19-2847-003","dockets":["ER19-2847-003","ER19-2847-000","EL20-9-000"],"caseNo":"ER19-2847-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,022","institution":"Oxbow Creek Energy LLC","library":"Electric","title":"ER19-2847-003 Commission Order/Opinion 196 FERC ¶ 61,022","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3031"},{"id":"ferc-commission-20260716-3030","accession":"20260716-3030","docket":"ER21-737-000","dockets":["ER21-737-000","ER21-737-001"],"caseNo":"ER21-737-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,021","institution":"Lakehurst Solar, L.L.C.","library":"Electric","title":"ER21-737-000 Commission Order/Opinion 196 FERC ¶ 61,021","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3030"},{"id":"ferc-commission-20260716-3029","accession":"20260716-3029","docket":"ER21-2832-002","dockets":["ER21-2832-002","ER21-2832-000","ER21-2833-002","ER21-2833-000"],"caseNo":"ER21-2832-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,020","institution":"Eagle Creek Reusens Hydro, LLC et al.","library":"Electric","title":"ER21-2832-002 Commission Order/Opinion 196 FERC ¶ 61,020","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3029"},{"id":"ferc-commission-20260716-3028","accession":"20260716-3028","docket":"EL26-47-000","dockets":["EL26-47-000"],"caseNo":"EL26-47-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,019","institution":"North Carolina Electric Membership Corporation v. Duke Energy Progress, LLC","library":"Electric","title":"EL26-47-000 Commission Order/Opinion 196 FERC ¶ 61,019","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3028"},{"id":"ferc-commission-20260716-3027","accession":"20260716-3027","docket":"EL26-40-000","dockets":["EL26-40-000"],"caseNo":"EL26-40-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,018","institution":"Public Citizen, Inc. v. Public Service Electric and Gas Company","library":"Electric","title":"EL26-40-000 Commission Order/Opinion 196 FERC ¶ 61,018","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3027"},{"id":"ferc-commission-20260716-3026","accession":"20260716-3026","docket":"ER16-1341-005","dockets":["ER16-1341-005"],"caseNo":"ER16-1341-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,017","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER16-1341-005 Commission Order/Opinion 196 FERC ¶ 61,017","publishedAt":"2026-07-16","page":23,"before":"ferc-commission-20260716-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3026"},{"id":"ferc-commission-20260716-3024","accession":"20260716-3024","docket":"ER23-2982-000","dockets":["ER23-2982-000"],"caseNo":"ER23-2982-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-16","citation":"196 FERC ¶ 61,026","institution":"BP Energy Company","library":"Electric","title":"ER23-2982-000 Commission Order/Opinion 196 FERC ¶ 61,026","publishedAt":"2026-07-16","page":22,"before":"ferc-commission-20260720-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260716-3024"},{"id":"ferc-commission-20260714-3014","accession":"20260714-3014","docket":"EL22-43-000","dockets":["EL22-43-000","ER22-944-003"],"caseNo":"EL22-43-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-14","citation":"195 FERC ¶ 61,264","institution":"Black Rock Wind Force, LLC","library":"Electric","title":"EL22-43-000 Commission Order/Opinion 195 FERC ¶ 61,264","publishedAt":"2026-07-14","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260714-3014"},{"id":"ferc-commission-20260714-3012","accession":"20260714-3012","docket":"ER19-1409-009","dockets":["ER19-1409-009","ER26-2578-000"],"caseNo":"ER19-1409-009","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-14","citation":"196 FERC ¶ 61,016","institution":"Birdsboro Power LLC","library":"Electric","title":"ER19-1409-009 Commission Order/Opinion 196 FERC ¶ 61,016","publishedAt":"2026-07-14","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260714-3012"},{"id":"ferc-commission-20260710-3045","accession":"20260710-3045","docket":"RP26-864-000","dockets":["RP26-864-000"],"caseNo":"RP26-864-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-10","citation":"196 FERC ¶ 61,013","institution":"Calpine Energy Services, L.P. et al.","library":"Gas","title":"RP26-864-000 Commission Order/Opinion 196 FERC ¶ 61,013","publishedAt":"2026-07-10","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260710-3045"},{"id":"ferc-commission-20260710-3043","accession":"20260710-3043","docket":"EL26-81-000","dockets":["EL26-81-000","ER26-1734-001"],"caseNo":"EL26-81-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-10","citation":"196 FERC ¶ 61,015","institution":"Kammer Juniata Transmission, LLC","library":"Electric","title":"EL26-81-000 Commission Order/Opinion 196 FERC ¶ 61,015","publishedAt":"2026-07-10","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260710-3043"},{"id":"ferc-commission-20260710-3026","accession":"20260710-3026","docket":"ER26-2518-000","dockets":["ER26-2518-000"],"caseNo":"ER26-2518-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-10","citation":"196 FERC ¶ 61,014","institution":"Letter order accepting Arizona Public Service Company's 05/13/2026 filing of revisions to its Large Generator Interconnection Procedures in Attachment O of its Open Access Transmission Tariff etc.","library":"Electric","title":"ER26-2518-000 Commission Order/Opinion 196 FERC ¶ 61,014","publishedAt":"2026-07-10","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260710-3026"},{"id":"ferc-commission-20260709-3076","accession":"20260709-3076","docket":"ER26-2783-000","dockets":["ER26-2783-000"],"caseNo":"ER26-2783-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-09","citation":"196 FERC ¶ 61,011","institution":"Jersey Central Power & Light Company","library":"Electric","title":"ER26-2783-000 Commission Order/Opinion 196 FERC ¶ 61,011","publishedAt":"2026-07-09","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260709-3076"},{"id":"ferc-commission-20260709-3012","accession":"20260709-3012","docket":"EL26-72-000","dockets":["EL26-72-000"],"caseNo":"EL26-72-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-09","citation":"196 FERC ¶ 61,012","institution":"ISO New England Inc. et al.","library":"Electric","title":"EL26-72-000 Commission Order/Opinion 196 FERC ¶ 61,012","publishedAt":"2026-07-09","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260709-3012"},{"id":"ferc-commission-20260706-3053","accession":"20260706-3053","docket":"ER26-2506-000","dockets":["ER26-2506-000"],"caseNo":"ER26-2506-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-06","citation":"196 FERC ¶ 61,010","institution":"Virginia Electric and Power Company et al.","library":"Electric","title":"ER26-2506-000 Commission Order/Opinion 196 FERC ¶ 61,010","publishedAt":"2026-07-06","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260706-3053"},{"id":"ferc-commission-20260702-3083","accession":"20260702-3083","docket":"ER26-1655-001","dockets":["ER26-1655-001","EL26-76-000","ER26-1655-000"],"caseNo":"ER26-1655-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-02","citation":"196 FERC ¶ 61,008","institution":"Grid Growth Ohio, LLC et al.","library":"Electric","title":"ER26-1655-001 Commission Order/Opinion 196 FERC ¶ 61,008","publishedAt":"2026-07-02","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260702-3083"},{"id":"ferc-commission-20260702-3059","accession":"20260702-3059","docket":"ER26-2771-000","dockets":["ER26-2771-000"],"caseNo":"ER26-2771-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-02","citation":"196 FERC ¶ 61,006","institution":"Chestnut Run Energy LLC","library":"Electric","title":"ER26-2771-000 Commission Order/Opinion 196 FERC ¶ 61,006","publishedAt":"2026-07-02","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260702-3059"},{"id":"ferc-commission-20260702-3022","accession":"20260702-3022","docket":"ER26-455-001","dockets":["ER26-455-001"],"caseNo":"ER26-455-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-02","citation":"196 FERC ¶ 61,007","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-455-001 Commission Order/Opinion 196 FERC ¶ 61,007","publishedAt":"2026-07-02","page":25,"before":"ferc-commission-20260716-3110","paidUrl":"/ferc-issuances?id=ferc-commission-20260702-3022"},{"id":"ferc-commission-20260701-3083","accession":"20260701-3083","docket":"ER17-1821-011","dockets":["ER17-1821-011","ER17-1821-000","EL25-101-000"],"caseNo":"ER17-1821-011","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-01","citation":"196 FERC ¶ 61,004","institution":"Letter order approving Potomac Energy Center, LLC's 11/22/2025 filing of an Offer of Settlement addressing the annual revenue requirement for Reactive Service etc.","library":"Electric","title":"ER17-1821-011 Commission Order/Opinion 196 FERC ¶ 61,004","publishedAt":"2026-07-01","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260701-3083"},{"id":"ferc-commission-20260701-3048","accession":"20260701-3048","docket":"ER26-1040-000","dockets":["ER26-1040-000","EL22-83-000"],"caseNo":"ER26-1040-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-01","citation":"196 FERC ¶ 61,005","institution":"Letter order accepting Midcontinent Independent System Operator, Inc.'s 01/14/2026 filing of revisions to Attachment FF of its Open Access Transmission, Energy and Operating Reserve Markets Tariff etc.","library":"Electric","title":"ER26-1040-000 Commission Order/Opinion 196 FERC ¶ 61,005","publishedAt":"2026-07-01","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260701-3048"},{"id":"ferc-commission-20260701-3028","accession":"20260701-3028","docket":"ER23-2112-000","dockets":["ER23-2112-000","EL24-17-000","ER23-2112-003"],"caseNo":"ER23-2112-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-01","citation":"196 FERC ¶ 61,001","institution":"Letter order approving Sandy Ridge Wind 2, LLC's 05/09/2024 filing of a Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"ER23-2112-000 Commission Order/Opinion 196 FERC ¶ 61,001","publishedAt":"2026-07-01","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260701-3028"},{"id":"ferc-commission-20260701-3027","accession":"20260701-3027","docket":"ER24-81-003","dockets":["ER24-81-003","ER24-81-000","EL24-13-000"],"caseNo":"ER24-81-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-07-01","citation":"196 FERC ¶ 61,003","institution":"Letter order approving Shady Oaks Wind 2, LLC's 05/09/2024 filing of a Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service, etc.","library":"Electric","title":"ER24-81-003 Commission Order/Opinion 196 FERC ¶ 61,003","publishedAt":"2026-07-01","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260701-3027"},{"id":"ferc-commission-20260630-3098","accession":"20260630-3098","docket":"CP16-18-000","dockets":["CP16-18-000","CP10-22-000","CP25-233-000"],"caseNo":"CP16-18-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,263","institution":"Magnum Gas Storage, LLC","library":"Gas","title":"CP16-18-000 Commission Order/Opinion 195 FERC ¶ 61,263","publishedAt":"2026-06-30","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3098"},{"id":"ferc-commission-20260630-3095","accession":"20260630-3095","docket":"ER26-2435-000","dockets":["ER26-2435-000"],"caseNo":"ER26-2435-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,267","institution":"Tri-State Generation and Transmission Association, Inc.","library":"Electric","title":"ER26-2435-000 Commission Order/Opinion 195 FERC ¶ 61,267","publishedAt":"2026-06-30","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3095"},{"id":"ferc-commission-20260630-3061","accession":"20260630-3061","docket":"ER23-1736-000","dockets":["ER23-1736-000","ER23-1736-002","EL23-78-000"],"caseNo":"ER23-1736-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,262","institution":"Big Plain Solar, LLC","library":"Electric","title":"ER23-1736-000 Commission Order/Opinion 195 FERC ¶ 61,262","publishedAt":"2026-06-30","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3061"},{"id":"ferc-commission-20260630-3060","accession":"20260630-3060","docket":"RP25-966-001","dockets":["RP25-966-001"],"caseNo":"RP25-966-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,266","institution":"Jay-Bee Production Company v. Texas Gas Transmission, LLC","library":"Gas","title":"RP25-966-001 Commission Order/Opinion 195 FERC ¶ 61,266","publishedAt":"2026-06-30","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3060"},{"id":"ferc-commission-20260630-3047","accession":"20260630-3047","docket":"EL22-43-000","dockets":["EL22-43-000","ER22-944-003"],"caseNo":"EL22-43-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,264","institution":"Black Rock Wind Force, LLC","library":"Electric","title":"EL22-43-000 Commission Order/Opinion 195 FERC ¶ 61,264","publishedAt":"2026-06-30","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3047"},{"id":"ferc-commission-20260630-3039","accession":"20260630-3039","docket":"ER21-1937-002","dockets":["ER21-1937-002","ER21-1937-000","EL21-84-000"],"caseNo":"ER21-1937-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,265","institution":"Altavista Solar, LLC","library":"Electric","title":"ER21-1937-002 Commission Order/Opinion 195 FERC ¶ 61,265","publishedAt":"2026-06-30","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3039"},{"id":"ferc-commission-20260630-3022","accession":"20260630-3022","docket":"RP20-614-009","dockets":["RP20-614-009","RP20-618-004"],"caseNo":"RP20-614-009","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,261","institution":"Transcontinental Gas Pipe Line Company, LLC","library":"Gas","title":"RP20-614-009 Commission Order/Opinion 195 FERC ¶ 61,261","publishedAt":"2026-06-30","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3022"},{"id":"ferc-commission-20260630-3021","accession":"20260630-3021","docket":"RP26-884-000","dockets":["RP26-884-000"],"caseNo":"RP26-884-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-30","citation":"195 FERC ¶ 61,268","institution":"WBI Energy Transmission, Inc.","library":"Gas","title":"RP26-884-000 Commission Order/Opinion 195 FERC ¶ 61,268","publishedAt":"2026-06-30","page":26,"before":"ferc-commission-20260702-3022","paidUrl":"/ferc-issuances?id=ferc-commission-20260630-3021"},{"id":"ferc-commission-20260629-3079","accession":"20260629-3079","docket":"EL26-37-000","dockets":["EL26-37-000"],"caseNo":"EL26-37-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-29","citation":"195 FERC ¶ 61,260","institution":"Duke Energy Florida, LLC","library":"Electric","title":"EL26-37-000 Commission Order/Opinion 195 FERC ¶ 61,260","publishedAt":"2026-06-29","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260629-3079"},{"id":"ferc-commission-20260629-3073","accession":"20260629-3073","docket":"ER26-2446-000","dockets":["ER26-2446-000"],"caseNo":"ER26-2446-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-29","citation":"195 FERC ¶ 61,259","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-2446-000 Commission Order/Opinion 195 FERC ¶ 61,259","publishedAt":"2026-06-29","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260629-3073"},{"id":"ferc-commission-20260629-3072","accession":"20260629-3072","docket":"ER26-2458-000","dockets":["ER26-2458-000"],"caseNo":"ER26-2458-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-29","citation":"195 FERC ¶ 61,257","institution":"Braided Creek Wind, LLC","library":"Electric","title":"ER26-2458-000 Commission Order/Opinion 195 FERC ¶ 61,257","publishedAt":"2026-06-29","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260629-3072"},{"id":"ferc-commission-20260629-3070","accession":"20260629-3070","docket":"ER26-2389-000","dockets":["ER26-2389-000"],"caseNo":"ER26-2389-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-29","citation":"195 FERC ¶ 61,258","institution":"Eversource Energy et al.","library":"Electric","title":"ER26-2389-000 Commission Order/Opinion 195 FERC ¶ 61,258","publishedAt":"2026-06-29","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260629-3070"},{"id":"ferc-commission-20260629-3006","accession":"20260629-3006","docket":"CP24-13-000","dockets":["CP24-13-000"],"caseNo":"CP24-13-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-29","citation":"195 FERC ¶ 61,255","institution":"MountainWest Overthrust Pipeline, LLC's Westbound Compression Expansion Project","library":"Gas","title":"CP24-13-000 Commission Order/Opinion 195 FERC ¶ 61,255","publishedAt":"2026-06-29","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260629-3006"},{"id":"ferc-commission-20260626-3115","accession":"20260626-3115","docket":"ER26-2376-000","dockets":["ER26-2376-000"],"caseNo":"ER26-2376-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,251","institution":"Midcontinent Grid Solutions Wisconsin, LLC's BECI Proj., ER26-2376. Chairman Swett and Commr. Rosner are concurring w/ a joint sep. stmt. attached. Commr. Chang is dissenting in part w/ a sep. stmt. attached.","library":"Electric","title":"ER26-2376-000 Commission Order/Opinion 195 FERC ¶ 61,251","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3115"},{"id":"ferc-commission-20260626-3109","accession":"20260626-3109","docket":"ER26-2561-000","dockets":["ER26-2561-000","TS26-4-000"],"caseNo":"ER26-2561-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,249","institution":"Hollis Creek PV I, LLC","library":"Electric","title":"ER26-2561-000 Commission Order/Opinion 195 FERC ¶ 61,249","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3109"},{"id":"ferc-commission-20260626-3094","accession":"20260626-3094","docket":"AC26-40-000","dockets":["AC26-40-000"],"caseNo":"AC26-40-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,246","institution":"Jersey Central Power & Light Company","library":"Electric","title":"AC26-40-000 Commission Order/Opinion 195 FERC ¶ 61,246","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3094"},{"id":"ferc-commission-20260626-3091","accession":"20260626-3091","docket":"ER26-1431-000","dockets":["ER26-1431-000","ER26-1431-001"],"caseNo":"ER26-1431-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,250","institution":"New York Independent System Operator, Inc.","library":"Electric","title":"ER26-1431-000 Commission Order/Opinion 195 FERC ¶ 61,250","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3091"},{"id":"ferc-commission-20260626-3080","accession":"20260626-3080","docket":"ER26-1602-000","dockets":["ER26-1602-000"],"caseNo":"ER26-1602-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,245","institution":"Blossom Solar, LLC","library":"Electric","title":"ER26-1602-000 Commission Order/Opinion 195 FERC ¶ 61,245","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3080"},{"id":"ferc-commission-20260626-3058","accession":"20260626-3058","docket":"RP26-920-000","dockets":["RP26-920-000"],"caseNo":"RP26-920-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,244","institution":"Northern Natural Gas Company","library":"Gas","title":"RP26-920-000 Commission Order/Opinion 195 FERC ¶ 61,244","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3058"},{"id":"ferc-commission-20260626-3029","accession":"20260626-3029","docket":"ER19-1506-000","dockets":["ER19-1506-000","ER21-1501-005","EL25-28-000","EL25-27-000","ER21-1501-000","ER17-2386-006","ER17-2386-000","EL25-25-000","ER19-1195-006","ER19-1195-000","EL25-26-000","ER19-1506-006"],"caseNo":"ER19-1506-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,248","institution":"Letter order approving Great Bay Solar I, LLC's et al. 03/20/2026 filing of a Settlement Agreement addressing the rate schedule for Reactive Supply and Voltage Control from Generation Sources Service","library":"Electric","title":"ER19-1506-000 Commission Order/Opinion 195 FERC ¶ 61,248","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3029"},{"id":"ferc-commission-20260626-3026","accession":"20260626-3026","docket":"ER19-1216-005","dockets":["ER19-1216-005","ER19-1216-000","EL25-50-000"],"caseNo":"ER19-1216-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,247","institution":"Letter order approving Northwest Ohio Wind, LLC's 03/26/2026 filing of an Offer of Settlement and Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"ER19-1216-005 Commission Order/Opinion 195 FERC ¶ 61,247","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3026"},{"id":"ferc-commission-20260626-3013","accession":"20260626-3013","docket":"RP26-895-000","dockets":["RP26-895-000"],"caseNo":"RP26-895-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,254","institution":"Letter order accepting BBT Trans-Union Interstate Pipeline, LP's 05/29/2026 filing of a revised tariff record reflecting a Negotiated Rate Agreement with LSB Chemical L.L.C.","library":"Gas","title":"RP26-895-000 Commission Order/Opinion 195 FERC ¶ 61,254","publishedAt":"2026-06-26","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3013"},{"id":"ferc-commission-20260626-3006","accession":"20260626-3006","docket":"ER26-2318-000","dockets":["ER26-2318-000"],"caseNo":"ER26-2318-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-26","citation":"195 FERC ¶ 61,252","institution":"Alcoa Power Generating Inc.","library":"Electric","title":"ER26-2318-000 Commission Order/Opinion 195 FERC ¶ 61,252","publishedAt":"2026-06-26","page":27,"before":"ferc-commission-20260630-3047","paidUrl":"/ferc-issuances?id=ferc-commission-20260626-3006"},{"id":"ferc-commission-20260625-3059","accession":"20260625-3059","docket":"EL22-34-002","dockets":["EL22-34-002"],"caseNo":"EL22-34-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-25","citation":"195 FERC ¶ 61,241","institution":"Office of the Ohio Consumers’ Counsel v. American Electric Power Service Corporation et al.","library":"Electric","title":"EL22-34-002 Commission Order/Opinion 195 FERC ¶ 61,241","publishedAt":"2026-06-25","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260625-3059"},{"id":"ferc-commission-20260625-3043","accession":"20260625-3043","docket":"CP25-177-000","dockets":["CP25-177-000"],"caseNo":"CP25-177-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-25","citation":"195 FERC ¶ 61,242","institution":"UGI LNG, Inc.","library":"Gas","title":"CP25-177-000 Commission Order/Opinion 195 FERC ¶ 61,242","publishedAt":"2026-06-25","page":28,"before":"ferc-commission-20260626-3006","paidUrl":"/ferc-issuances?id=ferc-commission-20260625-3043"},{"id":"ferc-commission-20260624-3104","accession":"20260624-3104","docket":"ER24-1927-000","dockets":["ER24-1927-000","ER15-1706-005","EL23-76-000"],"caseNo":"ER24-1927-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-24","citation":"195 FERC ¶ 61,240","institution":"Newark Energy Center, LLC","library":"Electric","title":"ER24-1927-000 Commission Order/Opinion 195 FERC ¶ 61,240","publishedAt":"2026-06-24","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260624-3104"},{"id":"ferc-commission-20260623-3091","accession":"20260623-3091","docket":"CP25-551-000","dockets":["CP25-551-000"],"caseNo":"CP25-551-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,236","institution":"Great Basin Gas Transmission Company's Gabbs Lateral Relocation Project","library":"Gas","title":"CP25-551-000 Commission Order/Opinion 195 FERC ¶ 61,236","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3091"},{"id":"ferc-commission-20260623-3083","accession":"20260623-3083","docket":"ER26-2303-000","dockets":["ER26-2303-000"],"caseNo":"ER26-2303-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,239","institution":"The Dayton Power and Light Company","library":"Electric","title":"ER26-2303-000 Commission Order/Opinion 195 FERC ¶ 61,239","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3083"},{"id":"ferc-commission-20260623-3082","accession":"20260623-3082","docket":"ER26-1281-000","dockets":["ER26-1281-000","ER26-1281-001"],"caseNo":"ER26-1281-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,237","institution":"Southwestern Public Service Company","library":"Electric","title":"ER26-1281-000 Commission Order/Opinion 195 FERC ¶ 61,237","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3082"},{"id":"ferc-commission-20260623-3047","accession":"20260623-3047","docket":"ER26-1197-002","dockets":["ER26-1197-002"],"caseNo":"ER26-1197-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,238","institution":"Public Service Company of Oklahoma","library":"Electric","title":"ER26-1197-002 Commission Order/Opinion 195 FERC ¶ 61,238","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3047"},{"id":"ferc-commission-20260623-3016","accession":"20260623-3016","docket":"ER22-2867-005","dockets":["ER22-2867-005","ER22-2867-000","EL23-70-000"],"caseNo":"ER22-2867-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,234","institution":"Letter order approving Bluegrass Solar, LLC's 01/04/2024 filing of a Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"ER22-2867-005 Commission Order/Opinion 195 FERC ¶ 61,234","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3016"},{"id":"ferc-commission-20260623-3015","accession":"20260623-3015","docket":"ER21-2819-003","dockets":["ER21-2819-003","ER21-2819-000"],"caseNo":"ER21-2819-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,232","institution":"South Field Energy LLC","library":"Electric","title":"ER21-2819-003 Commission Order/Opinion 195 FERC ¶ 61,232","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3015"},{"id":"ferc-commission-20260623-3013","accession":"20260623-3013","docket":"ER24-2166-001","dockets":["ER24-2166-001","ER24-2166-000"],"caseNo":"ER24-2166-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,233","institution":"Invenergy Nelson Expansion LLC","library":"Electric","title":"ER24-2166-001 Commission Order/Opinion 195 FERC ¶ 61,233","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3013"},{"id":"ferc-commission-20260623-3012","accession":"20260623-3012","docket":"EL24-114-000","dockets":["EL24-114-000","ER24-627-002","ER24-627-000"],"caseNo":"EL24-114-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-23","citation":"195 FERC ¶ 61,235","institution":"Letter order approving Mammoth North LLC's 08/20/2024 filing of a joint Offer of Settlement and Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"EL24-114-000 Commission Order/Opinion 195 FERC ¶ 61,235","publishedAt":"2026-06-23","page":29,"before":"ferc-commission-20260625-3043","paidUrl":"/ferc-issuances?id=ferc-commission-20260623-3012"},{"id":"ferc-commission-20260622-3087","accession":"20260622-3087","docket":"EL25-72-001","dockets":["EL25-72-001"],"caseNo":"EL25-72-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,221","institution":"Theresa Ghiorzi and Alfred T. Ghiorzi v. PJM Interconnection, L.L.C.","library":"Electric","title":"EL25-72-001 Commission Order/Opinion 195 FERC ¶ 61,221","publishedAt":"2026-06-22","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3087"},{"id":"ferc-commission-20260622-3086","accession":"20260622-3086","docket":"EL26-57-000","dockets":["EL26-57-000"],"caseNo":"EL26-57-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,222","institution":"Adam Gaal v. ISO New England Inc.","library":"Electric","title":"EL26-57-000 Commission Order/Opinion 195 FERC ¶ 61,222","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3086"},{"id":"ferc-commission-20260622-3085","accession":"20260622-3085","docket":"ER26-2294-000","dockets":["ER26-2294-000"],"caseNo":"ER26-2294-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,227","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-2294-000 Commission Order/Opinion 195 FERC ¶ 61,227","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3085"},{"id":"ferc-commission-20260622-3084","accession":"20260622-3084","docket":"ER26-2278-000","dockets":["ER26-2278-000"],"caseNo":"ER26-2278-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,228","institution":"Mid-Atlantic Offshore Development, LLC","library":"Electric","title":"ER26-2278-000 Commission Order/Opinion 195 FERC ¶ 61,228","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3084"},{"id":"ferc-commission-20260622-3083","accession":"20260622-3083","docket":"ER23-305-001","dockets":["ER23-305-001","ER23-305-000"],"caseNo":"ER23-305-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,231","institution":"Dynasty Power Inc.","library":"Electric","title":"ER23-305-001 Commission Order/Opinion 195 FERC ¶ 61,231","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3083"},{"id":"ferc-commission-20260622-3080","accession":"20260622-3080","docket":"EL26-48-000","dockets":["EL26-48-000"],"caseNo":"EL26-48-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,223","institution":"Bioenergy Association of California v. California Public Utilities Commission","library":"Electric","title":"EL26-48-000 Commission Order/Opinion 195 FERC ¶ 61,223","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3080"},{"id":"ferc-commission-20260622-3076","accession":"20260622-3076","docket":"ER26-2487-000","dockets":["ER26-2487-000"],"caseNo":"ER26-2487-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,230","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-2487-000 Commission Order/Opinion 195 FERC ¶ 61,230","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3076"},{"id":"ferc-commission-20260622-3075","accession":"20260622-3075","docket":"ER26-2290-000","dockets":["ER26-2290-000"],"caseNo":"ER26-2290-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,220","institution":"Dominion Energy South Carolina, Inc.","library":"Electric","title":"ER26-2290-000 Commission Order/Opinion 195 FERC ¶ 61,220","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3075"},{"id":"ferc-commission-20260622-3073","accession":"20260622-3073","docket":"EL26-52-000","dockets":["EL26-52-000"],"caseNo":"EL26-52-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,229","institution":"Brookfield Corporation","library":"Electric","title":"EL26-52-000 Commission Order/Opinion 195 FERC ¶ 61,229","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3073"},{"id":"ferc-commission-20260622-3072","accession":"20260622-3072","docket":"ER25-316-001","dockets":["ER25-316-001","ER25-316-000","AC25-15-000"],"caseNo":"ER25-316-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,224","institution":"Letter order approving Wisconsin Electric Power Company's 03/06/2026 filing of an Offer of Settlement and Settlement Agreement and related materials addressing its recovery through jurisdictional rates etc.","library":"Electric","title":"ER25-316-001 Commission Order/Opinion 195 FERC ¶ 61,224","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3072"},{"id":"ferc-commission-20260622-3071","accession":"20260622-3071","docket":"ER26-2279-000","dockets":["ER26-2279-000","TS26-3-000"],"caseNo":"ER26-2279-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-22","citation":"195 FERC ¶ 61,225","institution":"Crossover Wind LLC","library":"Electric","title":"ER26-2279-000 Commission Order/Opinion 195 FERC ¶ 61,225","publishedAt":"2026-06-22","page":30,"before":"ferc-commission-20260623-3091","paidUrl":"/ferc-issuances?id=ferc-commission-20260622-3071"},{"id":"ferc-commission-20260618-3110","accession":"20260618-3110","docket":"EL26-68-000","dockets":["EL26-68-000"],"caseNo":"EL26-68-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,213","institution":"Southwest Power Pool, Inc. et al.","library":"Electric","title":"EL26-68-000 Commission Order/Opinion 195 FERC ¶ 61,213","publishedAt":"2026-06-18","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3110"},{"id":"ferc-commission-20260618-3105","accession":"20260618-3105","docket":"EL26-67-000","dockets":["EL26-67-000"],"caseNo":"EL26-67-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,211","institution":"PJM Interconnection, L.L.C. et al.","library":"Electric","title":"EL26-67-000 Commission Order/Opinion 195 FERC ¶ 61,211","publishedAt":"2026-06-18","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3105"},{"id":"ferc-commission-20260618-3103","accession":"20260618-3103","docket":"AD24-11-001","dockets":["AD24-11-001","EL25-20-001","ER26-1479-000","EL25-49-002","EL25-49-000"],"caseNo":"AD24-11-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,209","institution":"PJM Interconnection, L.L.C. et al.","library":"Electric","title":"AD24-11-001 Commission Order/Opinion 195 FERC ¶ 61,209","publishedAt":"2026-06-18","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3103"},{"id":"ferc-commission-20260618-3092","accession":"20260618-3092","docket":"ER25-1886-001","dockets":["ER25-1886-001","ER25-1886-000"],"caseNo":"ER25-1886-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,210","institution":"Midcontinent Independent System Operator, Inc.","library":"Electric","title":"ER25-1886-001 Commission Order/Opinion 195 FERC ¶ 61,210","publishedAt":"2026-06-18","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3092"},{"id":"ferc-commission-20260618-3083","accession":"20260618-3083","docket":"EL26-71-000","dockets":["EL26-71-000"],"caseNo":"EL26-71-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,214","institution":"California Independent System Operator Corporation et al.","library":"Electric","title":"EL26-71-000 Commission Order/Opinion 195 FERC ¶ 61,214","publishedAt":"2026-06-18","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3083"},{"id":"ferc-commission-20260618-3080","accession":"20260618-3080","docket":"CP25-528-000","dockets":["CP25-528-000"],"caseNo":"CP25-528-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,218","institution":"Eastern Gas Transmission and Storage, Inc.'s Appalachian Reliability Project","library":"Gas","title":"CP25-528-000 Commission Order/Opinion 195 FERC ¶ 61,218","publishedAt":"2026-06-18","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3080"},{"id":"ferc-commission-20260618-3076","accession":"20260618-3076","docket":"EL26-72-000","dockets":["EL26-72-000"],"caseNo":"EL26-72-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,215","institution":"ISO New England Inc. et al.","library":"Electric","title":"EL26-72-000 Commission Order/Opinion 195 FERC ¶ 61,215","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3076"},{"id":"ferc-commission-20260618-3063","accession":"20260618-3063","docket":"EL26-69-000","dockets":["EL26-69-000"],"caseNo":"EL26-69-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,216","institution":"New York Independent System Operator, Inc. et al., EL26-69. Chmn. Swett, Comm'r. Rosner, Comm'r. See, Comm'r. Chang, and Comm'r. LaCerte are concurring w/ sep. stmt attached.","library":"Electric","title":"EL26-69-000 Commission Order/Opinion 195 FERC ¶ 61,216","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3063"},{"id":"ferc-commission-20260618-3056","accession":"20260618-3056","docket":"RP26-857-000","dockets":["RP26-857-000"],"caseNo":"RP26-857-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,219","institution":"Calypso Exploration, LLC et al.","library":"Gas","title":"RP26-857-000 Commission Order/Opinion 195 FERC ¶ 61,219","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3056"},{"id":"ferc-commission-20260618-3047","accession":"20260618-3047","docket":"EL26-70-000","dockets":["EL26-70-000"],"caseNo":"EL26-70-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,212","institution":"Midcontinent Independent System Operator, Inc. et al.","library":"Electric","title":"EL26-70-000 Commission Order/Opinion 195 FERC ¶ 61,212","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3047"},{"id":"ferc-commission-20260618-3045","accession":"20260618-3045","docket":"CP25-10-001","dockets":["CP25-10-001"],"caseNo":"CP25-10-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,217","institution":"Transcontinental Gas Pipe Line Company, LLC's Southeast Supply Enhancement Project","library":"Gas","title":"CP25-10-001 Commission Order/Opinion 195 FERC ¶ 61,217","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3045"},{"id":"ferc-commission-20260618-3044","accession":"20260618-3044","docket":"ER23-313-000","dockets":["ER23-313-000"],"caseNo":"ER23-313-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,203","institution":"Public Service Company of New Mexico","library":"Electric","title":"ER23-313-000 Commission Order/Opinion 195 FERC ¶ 61,203","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3044"},{"id":"ferc-commission-20260618-3041","accession":"20260618-3041","docket":"ER23-340-000","dockets":["ER23-340-000"],"caseNo":"ER23-340-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,204","institution":"El Paso Electric Company","library":"Electric","title":"ER23-340-000 Commission Order/Opinion 195 FERC ¶ 61,204","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3041"},{"id":"ferc-commission-20260618-3040","accession":"20260618-3040","docket":"ER23-312-000","dockets":["ER23-312-000"],"caseNo":"ER23-312-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,205","institution":"Townsite Solar, LLC","library":"Electric","title":"ER23-312-000 Commission Order/Opinion 195 FERC ¶ 61,205","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3040"},{"id":"ferc-commission-20260618-3039","accession":"20260618-3039","docket":"CP26-52-000","dockets":["CP26-52-000"],"caseNo":"CP26-52-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-18","citation":"195 FERC ¶ 61,208","institution":"Cheniere Creole Trail Pipeline, L.P.'s Gillis Header Project","library":"Gas","title":"CP26-52-000 Commission Order/Opinion 195 FERC ¶ 61,208","publishedAt":"2026-06-18","page":31,"before":"ferc-commission-20260622-3086","paidUrl":"/ferc-issuances?id=ferc-commission-20260618-3039"},{"id":"ferc-commission-20260615-3056","accession":"20260615-3056","docket":"RP26-783-000","dockets":["RP26-783-000"],"caseNo":"RP26-783-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-15","citation":"195 FERC ¶ 61,202","institution":"Basin Electric Power Cooperative et al.","library":"Gas","title":"RP26-783-000 Commission Order/Opinion 195 FERC ¶ 61,202","publishedAt":"2026-06-15","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260615-3056"},{"id":"ferc-commission-20260615-3024","accession":"20260615-3024","docket":"ER26-1085-001","dockets":["ER26-1085-001"],"caseNo":"ER26-1085-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-15","citation":"195 FERC ¶ 61,200","institution":"Midcontinent Independent System Operator, Inc.","library":"Electric","title":"ER26-1085-001 Commission Order/Opinion 195 FERC ¶ 61,200","publishedAt":"2026-06-15","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260615-3024"},{"id":"ferc-commission-20260615-3022","accession":"20260615-3022","docket":"ER26-2262-000","dockets":["ER26-2262-000"],"caseNo":"ER26-2262-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-15","citation":"195 FERC ¶ 61,201","institution":"Pana Solar, LLC","library":"Electric","title":"ER26-2262-000 Commission Order/Opinion 195 FERC ¶ 61,201","publishedAt":"2026-06-15","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260615-3022"},{"id":"ferc-commission-20260612-3093","accession":"20260612-3093","docket":"EL24-124-001","dockets":["EL24-124-001"],"caseNo":"EL24-124-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-12","citation":"195 FERC ¶ 61,199","institution":"Affirmed Energy LLC v. PJM Interconnection, L.L.C.","library":"Electric","title":"EL24-124-001 Commission Order/Opinion 195 FERC ¶ 61,199","publishedAt":"2026-06-12","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260612-3093"},{"id":"ferc-commission-20260612-3089","accession":"20260612-3089","docket":"OR22-5-001","dockets":["OR22-5-001","OR24-9-000"],"caseNo":"OR22-5-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-12","citation":"195 FERC ¶ 61,198","institution":"TransMontaigne Partners LLC et al. v. Colonial Pipeline Company","library":"Oil","title":"OR22-5-001 Commission Order/Opinion 195 FERC ¶ 61,198","publishedAt":"2026-06-12","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260612-3089"},{"id":"ferc-commission-20260612-3024","accession":"20260612-3024","docket":"ER26-1085-001","dockets":["ER26-1085-001"],"caseNo":"ER26-1085-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-12","citation":"195 FERC ¶ 61,200","institution":"Midcontinent Independent System Operator, Inc.","library":"Electric","title":"ER26-1085-001 Commission Order/Opinion 195 FERC ¶ 61,200","publishedAt":"2026-06-12","page":32,"before":"ferc-commission-20260618-3076","paidUrl":"/ferc-issuances?id=ferc-commission-20260612-3024"},{"id":"ferc-commission-20260609-3072","accession":"20260609-3072","docket":"ER26-1563-000","dockets":["ER26-1563-000","ER26-1563-001"],"caseNo":"ER26-1563-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-09","citation":"195 FERC ¶ 61,197","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-1563-000 Commission Order/Opinion 195 FERC ¶ 61,197","publishedAt":"2026-06-09","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260609-3072"},{"id":"ferc-commission-20260605-3090","accession":"20260605-3090","docket":"ER26-1323-001","dockets":["ER26-1323-001","ER26-1323-000"],"caseNo":"ER26-1323-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,196","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER26-1323-001 Commission Order/Opinion 195 FERC ¶ 61,196","publishedAt":"2026-06-05","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3090"},{"id":"ferc-commission-20260605-3089","accession":"20260605-3089","docket":"CP25-525-000","dockets":["CP25-525-000"],"caseNo":"CP25-525-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,191","institution":"TTC Connector, LLC's TTC Project","library":"Gas","title":"CP25-525-000 Commission Order/Opinion 195 FERC ¶ 61,191","publishedAt":"2026-06-05","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3089"},{"id":"ferc-commission-20260605-3084","accession":"20260605-3084","docket":"NJ26-7-000","dockets":["NJ26-7-000"],"caseNo":"NJ26-7-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,193","institution":"Western Area Power Administration","library":"Electric","title":"NJ26-7-000 Commission Order/Opinion 195 FERC ¶ 61,193","publishedAt":"2026-06-05","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3084"},{"id":"ferc-commission-20260605-3082","accession":"20260605-3082","docket":"ER26-2040-000","dockets":["ER26-2040-000"],"caseNo":"ER26-2040-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,195","institution":"Letter order accepting Southwest Power Pool, Inc.'s 04/06/2026 filing of an executed Generator Interconnection Agreement with Crooked Creek Solar, LLC and AEP Oklahoma Transmission Company, Inc.","library":"Electric","title":"ER26-2040-000 Commission Order/Opinion 195 FERC ¶ 61,195","publishedAt":"2026-06-05","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3082"},{"id":"ferc-commission-20260605-3081","accession":"20260605-3081","docket":"CP25-495-001","dockets":["CP25-495-001"],"caseNo":"CP25-495-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,185","institution":"National Fuel Gas Supply Corporation","library":"Gas","title":"CP25-495-001 Commission Order/Opinion 195 FERC ¶ 61,185","publishedAt":"2026-06-05","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3081"},{"id":"ferc-commission-20260605-3072","accession":"20260605-3072","docket":"RP25-740-002","dockets":["RP25-740-002"],"caseNo":"RP25-740-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,184","institution":"Baltimore Gas and Electric Company et al. v. Columbia Gas Transmission, LLC","library":"Gas","title":"RP25-740-002 Commission Order/Opinion 195 FERC ¶ 61,184","publishedAt":"2026-06-05","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3072"},{"id":"ferc-commission-20260605-3061","accession":"20260605-3061","docket":"EL26-32-000","dockets":["EL26-32-000"],"caseNo":"EL26-32-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,186","institution":"Santa Paula Energy Storage, LLC et al. v. Southern California Edison Company","library":"Electric","title":"EL26-32-000 Commission Order/Opinion 195 FERC ¶ 61,186","publishedAt":"2026-06-05","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3061"},{"id":"ferc-commission-20260605-3054","accession":"20260605-3054","docket":"CP25-514-000","dockets":["CP25-514-000","CP25-517-000"],"caseNo":"CP25-514-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,194","institution":"Tennessee Gas Pipeline Company, L.L.C. et al.","library":"Gas","title":"CP25-514-000 Commission Order/Opinion 195 FERC ¶ 61,194","publishedAt":"2026-06-05","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3054"},{"id":"ferc-commission-20260605-3049","accession":"20260605-3049","docket":"ER20-2441-000","dockets":["ER20-2441-000","ER20-2442-000","EL20-68-000","ER21-426-000","ER21-682-000","ER21-768-000","ER22-137-000","EL22-10-000","ER23-194-000","EL23-12-000","ER23-2970-000","EL24-10-000","ER25-11-000","EL25-16-000"],"caseNo":"ER20-2441-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,189","institution":"Basin Electric Power Cooperative","library":"Electric","title":"ER20-2441-000 Commission Order/Opinion 195 FERC ¶ 61,189","publishedAt":"2026-06-05","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3049"},{"id":"ferc-commission-20260605-3034","accession":"20260605-3034","docket":"ER25-2020-000","dockets":["ER25-2020-000"],"caseNo":"ER25-2020-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,187","institution":"Letter order informing Basin Electric Power Cooperative that its compliance obligation, as directed in Order No. 904, is moot and terminate the proceeding","library":"Electric","title":"ER25-2020-000 Commission Order/Opinion 195 FERC ¶ 61,187","publishedAt":"2026-06-05","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3034"},{"id":"ferc-commission-20260605-3029","accession":"20260605-3029","docket":"ER22-2340-000","dockets":["ER22-2340-000","ER22-2340-001"],"caseNo":"ER22-2340-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,190","institution":"Letter order informing Basin Electric Power Cooperative that its compliance obligations","library":"Electric","title":"ER22-2340-000 Commission Order/Opinion 195 FERC ¶ 61,190","publishedAt":"2026-06-05","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3029"},{"id":"ferc-commission-20260605-3023","accession":"20260605-3023","docket":"ER26-1996-000","dockets":["ER26-1996-000"],"caseNo":"ER26-1996-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,192","institution":"Campbell County Wind Farm 2, LLC","library":"Electric","title":"ER26-1996-000 Commission Order/Opinion 195 FERC ¶ 61,192","publishedAt":"2026-06-05","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3023"},{"id":"ferc-commission-20260605-3019","accession":"20260605-3019","docket":"ER24-2043-001","dockets":["ER24-2043-001"],"caseNo":"ER24-2043-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-05","citation":"195 FERC ¶ 61,188","institution":"Letter order informing Basin Electric Power Cooperative that its compliance obligation","library":"Electric","title":"ER24-2043-001 Commission Order/Opinion 195 FERC ¶ 61,188","publishedAt":"2026-06-05","page":33,"before":"ferc-commission-20260612-3024","paidUrl":"/ferc-issuances?id=ferc-commission-20260605-3019"},{"id":"ferc-commission-20260604-3065","accession":"20260604-3065","docket":"ER23-2309-003","dockets":["ER23-2309-003","ER24-1394-003","EL26-34-001"],"caseNo":"ER23-2309-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-04","citation":"195 FERC ¶ 61,181","institution":"DCR Transmission, L.L.C.","library":"Electric","title":"ER23-2309-003 Commission Order/Opinion 195 FERC ¶ 61,181","publishedAt":"2026-06-04","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260604-3065"},{"id":"ferc-commission-20260604-3054","accession":"20260604-3054","docket":"ER21-1716-005","dockets":["ER21-1716-005","ER22-2519-003","ER23-1470-001","ER23-1476-001","ER10-2597-007","ER10-2481-007","ER11-2041-018","ER11-2042-018","ER10-1790-023","ER14-2672-024","ER12-1825-037","ER13-33-008","ER10-2468-005","ER10-3196-005","ER10-2273-005"],"caseNo":"ER21-1716-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-04","citation":"195 FERC ¶ 61,179","institution":"BP Energy Company et al.","library":"Electric","title":"ER21-1716-005 Commission Order/Opinion 195 FERC ¶ 61,179","publishedAt":"2026-06-04","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260604-3054"},{"id":"ferc-commission-20260604-3052","accession":"20260604-3052","docket":"ER13-1069-019","dockets":["ER13-1069-019","ER22-1779-002","ER14-1140-006","ER22-1777-002","ER12-2381-016","ER21-2001-001","ER10-1484-030"],"caseNo":"ER13-1069-019","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-04","citation":"195 FERC ¶ 61,182","institution":"Inspire Energy Holdings, LLC et al.","library":"Electric","title":"ER13-1069-019 Commission Order/Opinion 195 FERC ¶ 61,182","publishedAt":"2026-06-04","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260604-3052"},{"id":"ferc-commission-20260604-3049","accession":"20260604-3049","docket":"PR25-11-003","dockets":["PR25-11-003"],"caseNo":"PR25-11-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-04","citation":"195 FERC ¶ 61,177","institution":"Matterhorn Express Pipeline, LLC","library":"Gas","title":"PR25-11-003 Commission Order/Opinion 195 FERC ¶ 61,177","publishedAt":"2026-06-04","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260604-3049"},{"id":"ferc-commission-20260604-3037","accession":"20260604-3037","docket":"ER10-1915-012","dockets":["ER10-1915-012","ER23-1766-001","ER10-1963-012","ER20-2060-002","ER18-213-004","ER23-2113-001","ER10-3278-004","ER22-284-001","ER10-3274-004","ER10-2638-012","ER10-3275-006"],"caseNo":"ER10-1915-012","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-04","citation":"195 FERC ¶ 61,180","institution":"Bayswater Peaking Facility, LLC et al.","library":"Electric","title":"ER10-1915-012 Commission Order/Opinion 195 FERC ¶ 61,180","publishedAt":"2026-06-04","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260604-3037"},{"id":"ferc-commission-20260604-3016","accession":"20260604-3016","docket":"ER26-2061-000","dockets":["ER26-2061-000"],"caseNo":"ER26-2061-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-04","citation":"195 FERC ¶ 61,183","institution":"Letter order accepting PJM Interconnection, L.L.C.'s 04/07/2026 filing of revisions to its Open Access Transmission Tariff and to the Amended and Restated Operating Agreement etc.","library":"Electric","title":"ER26-2061-000 Commission Order/Opinion 195 FERC ¶ 61,183","publishedAt":"2026-06-04","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260604-3016"},{"id":"ferc-commission-20260604-3007","accession":"20260604-3007","docket":"ER22-1449-003","dockets":["ER22-1449-003","ER10-2799-019","ER10-2783-020","ER10-2960-016","ER10-1838-011","ER19-2231-008","ER19-2232-008","ER10-2798-019","ER22-1450-003","ER21-2423-007","ER10-1967-012","ER10-2878-020","ER23-1299-001","ER22-1402-004","ER22-1404-004","ER10-1990-011","ER10-1993-011","ER22-1662-003","ER21-2424-007","ER10-1968-011","ER10-2879-019","ER10-1616-019","ER10-2969-020","ER22-46-007","ER22-2713-002","ER18-1821-011"],"caseNo":"ER22-1449-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-04","citation":"195 FERC ¶ 61,178","institution":"Arthur Kill Power LLC et al.","library":"Electric","title":"ER22-1449-003 Commission Order/Opinion 195 FERC ¶ 61,178","publishedAt":"2026-06-04","page":34,"before":"ferc-commission-20260605-3061","paidUrl":"/ferc-issuances?id=ferc-commission-20260604-3007"},{"id":"ferc-commission-20260603-3087","accession":"20260603-3087","docket":"EL26-51-000","dockets":["EL26-51-000","QF26-411-001"],"caseNo":"EL26-51-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-03","citation":"195 FERC ¶ 61,173","institution":"NY CDG Oneida 2 LLC","library":"Electric","title":"EL26-51-000 Commission Order/Opinion 195 FERC ¶ 61,173","publishedAt":"2026-06-03","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260603-3087"},{"id":"ferc-commission-20260603-3070","accession":"20260603-3070","docket":"RP26-695-000","dockets":["RP26-695-000"],"caseNo":"RP26-695-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-03","citation":"195 FERC ¶ 61,176","institution":"Letter order accepting East Tennessee Natural Gas, LLC's 03/31/2026 filing of its cashout report for the annual period covering November 2024 through October 2025","library":"Gas","title":"RP26-695-000 Commission Order/Opinion 195 FERC ¶ 61,176","publishedAt":"2026-06-03","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260603-3070"},{"id":"ferc-commission-20260603-3032","accession":"20260603-3032","docket":"ER19-1409-000","dockets":["ER19-1409-000","ER19-1409-007","EL25-74-000"],"caseNo":"ER19-1409-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-03","citation":"195 FERC ¶ 61,174","institution":"Letter order approving Birdsboro Power LLC's 12/10/2025 filing of a Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation or Other Sources Service, etc.","library":"Electric","title":"ER19-1409-000 Commission Order/Opinion 195 FERC ¶ 61,174","publishedAt":"2026-06-03","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260603-3032"},{"id":"ferc-commission-20260603-3030","accession":"20260603-3030","docket":"ER19-31-005","dockets":["ER19-31-005","ER19-31-000","EL25-116-000"],"caseNo":"ER19-31-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-03","citation":"195 FERC ¶ 61,175","institution":"Letter order approving Oregon Clean Energy, LLC's 11/20/2025 filing of an Offer of Settlement addressing its rate schedule for Reactive Supply and Voltage Control from Generation or Other Sources Service, etc.","library":"Electric","title":"ER19-31-005 Commission Order/Opinion 195 FERC ¶ 61,175","publishedAt":"2026-06-03","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260603-3030"},{"id":"ferc-commission-20260602-3058","accession":"20260602-3058","docket":"CP25-79-001","dockets":["CP25-79-001"],"caseNo":"CP25-79-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-02","citation":"195 FERC ¶ 61,169","institution":"ANR Pipeline Company's Heartland Project","library":"Gas","title":"CP25-79-001 Commission Order/Opinion 195 FERC ¶ 61,169","publishedAt":"2026-06-02","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260602-3058"},{"id":"ferc-commission-20260602-3056","accession":"20260602-3056","docket":"ER26-1496-000","dockets":["ER26-1496-000"],"caseNo":"ER26-1496-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-02","citation":"195 FERC ¶ 61,172","institution":"Southern Power Company","library":"Electric","title":"ER26-1496-000 Commission Order/Opinion 195 FERC ¶ 61,172","publishedAt":"2026-06-02","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260602-3056"},{"id":"ferc-commission-20260602-3027","accession":"20260602-3027","docket":"RP25-1189-001","dockets":["RP25-1189-001"],"caseNo":"RP25-1189-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-02","citation":"195 FERC ¶ 61,170","institution":"Baltimore Gas and Electric Company v. Transcontinental Gas Pipe Line Company, LLC","library":"Gas","title":"RP25-1189-001 Commission Order/Opinion 195 FERC ¶ 61,170","publishedAt":"2026-06-02","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260602-3027"},{"id":"ferc-commission-20260602-3023","accession":"20260602-3023","docket":"EL22-6-001","dockets":["EL22-6-001","ER23-2821-000","ER21-915-000"],"caseNo":"EL22-6-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-02","citation":"195 FERC ¶ 61,167","institution":"Entergy Arkansas, LLC et al. v. Louisiana Public Service Commission","library":"Electric","title":"EL22-6-001 Commission Order/Opinion 195 FERC ¶ 61,167","publishedAt":"2026-06-02","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260602-3023"},{"id":"ferc-commission-20260602-3008","accession":"20260602-3008","docket":"ER25-1845-000","dockets":["ER25-1845-000","ER25-1845-003"],"caseNo":"ER25-1845-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-02","citation":"195 FERC ¶ 61,171","institution":"Letter order approving Orange and Rockland Utilities, Inc.'s 03/17/2026 filing of a Settlement Agreement addressing revisions to Attachment L of its Open Access Transmission Tariff, etc.","library":"Electric","title":"ER25-1845-000 Commission Order/Opinion 195 FERC ¶ 61,171","publishedAt":"2026-06-02","page":35,"before":"ferc-commission-20260604-3049","paidUrl":"/ferc-issuances?id=ferc-commission-20260602-3008"},{"id":"ferc-commission-20260601-3069","accession":"20260601-3069","docket":"CP26-36-000","dockets":["CP26-36-000"],"caseNo":"CP26-36-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,161","institution":"Corpus Christi Liquefaction, LLC et al.","library":"Gas","title":"CP26-36-000 Commission Order/Opinion 195 FERC ¶ 61,161","publishedAt":"2026-06-01","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3069"},{"id":"ferc-commission-20260601-3068","accession":"20260601-3068","docket":"ER26-2028-000","dockets":["ER26-2028-000"],"caseNo":"ER26-2028-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,162","institution":"Constellation Energy Generation, LLC","library":"Electric","title":"ER26-2028-000 Commission Order/Opinion 195 FERC ¶ 61,162","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3068"},{"id":"ferc-commission-20260601-3056","accession":"20260601-3056","docket":"ER26-2017-000","dockets":["ER26-2017-000","ER26-2018-000"],"caseNo":"ER26-2017-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,166","institution":"Avangrid Power, LLC et al.","library":"Electric","title":"ER26-2017-000 Commission Order/Opinion 195 FERC ¶ 61,166","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3056"},{"id":"ferc-commission-20260601-3055","accession":"20260601-3055","docket":"EC26-59-000","dockets":["EC26-59-000"],"caseNo":"EC26-59-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,168","institution":"Darby Power, LLC et al.","library":"Electric","title":"EC26-59-000 Commission Order/Opinion 195 FERC ¶ 61,168","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3055"},{"id":"ferc-commission-20260601-3046","accession":"20260601-3046","docket":"ER26-2014-000","dockets":["ER26-2014-000"],"caseNo":"ER26-2014-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,163","institution":"Letter order accepting El Paso Electric Company's 04/02/2026 filing of a proposed cost-based rate schedule for wholesale electricity sales at cost-based rates","library":"Electric","title":"ER26-2014-000 Commission Order/Opinion 195 FERC ¶ 61,163","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3046"},{"id":"ferc-commission-20260601-3045","accession":"20260601-3045","docket":"ER26-1262-000","dockets":["ER26-1262-000","ER26-1262-001"],"caseNo":"ER26-1262-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,165","institution":"Evergy Kansas Central, Inc.","library":"Electric","title":"ER26-1262-000 Commission Order/Opinion 195 FERC ¶ 61,165","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3045"},{"id":"ferc-commission-20260601-3041","accession":"20260601-3041","docket":"CP25-530-000","dockets":["CP25-530-000"],"caseNo":"CP25-530-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,154","institution":"Texas Eastern Transmission, LP's Danville Compressor Station Replacement Project","library":"Gas","title":"CP25-530-000 Commission Order/Opinion 195 FERC ¶ 61,154","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3041"},{"id":"ferc-commission-20260601-3018","accession":"20260601-3018","docket":"ER26-2431-000","dockets":["ER26-2431-000"],"caseNo":"ER26-2431-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,158","institution":"Panther Solar B912, LLC","library":"Electric","title":"ER26-2431-000 Commission Order/Opinion 195 FERC ¶ 61,158","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3018"},{"id":"ferc-commission-20260601-3017","accession":"20260601-3017","docket":"ER26-1263-000","dockets":["ER26-1263-000","ER26-1263-001"],"caseNo":"ER26-1263-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-06-01","citation":"195 FERC ¶ 61,164","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER26-1263-000 Commission Order/Opinion 195 FERC ¶ 61,164","publishedAt":"2026-06-01","page":36,"before":"ferc-commission-20260602-3027","paidUrl":"/ferc-issuances?id=ferc-commission-20260601-3017"},{"id":"ferc-commission-20260529-3070","accession":"20260529-3070","docket":"CP25-527-000","dockets":["CP25-527-000"],"caseNo":"CP25-527-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-29","citation":"195 FERC ¶ 61,153","institution":"Nueva Era Dos, LLC","library":"Gas","title":"CP25-527-000 Commission Order/Opinion 195 FERC ¶ 61,153","publishedAt":"2026-05-29","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260529-3070"},{"id":"ferc-commission-20260529-3069","accession":"20260529-3069","docket":"RP26-824-000","dockets":["RP26-824-000"],"caseNo":"RP26-824-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-29","citation":"195 FERC ¶ 61,157","institution":"Transwestern Pipeline Company, LLC","library":"Gas","title":"RP26-824-000 Commission Order/Opinion 195 FERC ¶ 61,157","publishedAt":"2026-05-29","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260529-3069"},{"id":"ferc-commission-20260529-3067","accession":"20260529-3067","docket":"ER26-1521-000","dockets":["ER26-1521-000"],"caseNo":"ER26-1521-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-29","citation":"195 FERC ¶ 61,155","institution":"Midcontinent Independent System Operator, Inc.","library":"Electric","title":"ER26-1521-000 Commission Order/Opinion 195 FERC ¶ 61,155","publishedAt":"2026-05-29","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260529-3067"},{"id":"ferc-commission-20260529-3031","accession":"20260529-3031","docket":"ER26-1956-000","dockets":["ER26-1956-000"],"caseNo":"ER26-1956-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-29","citation":"195 FERC ¶ 61,156","institution":"Letter order accepting ISO New England Inc.'s 03/30/2026 filing of proposed revisions to its Transmission, Markets, and Services to update market rules for the participation of Distributed Energy Resources in its markets etc.","library":"Electric","title":"ER26-1956-000 Commission Order/Opinion 195 FERC ¶ 61,156","publishedAt":"2026-05-29","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260529-3031"},{"id":"ferc-commission-20260529-3030","accession":"20260529-3030","docket":"EC26-44-000","dockets":["EC26-44-000"],"caseNo":"EC26-44-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-29","citation":"195 FERC ¶ 61,160","institution":"Black Hills Corporation et al.","library":"Electric","title":"EC26-44-000 Commission Order/Opinion 195 FERC ¶ 61,160","publishedAt":"2026-05-29","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260529-3030"},{"id":"ferc-commission-20260528-3094","accession":"20260528-3094","docket":"ER26-1927-000","dockets":["ER26-1927-000"],"caseNo":"ER26-1927-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-28","citation":"195 FERC ¶ 61,152","institution":"Big Rivers Electric Corporation et al.","library":"Electric","title":"ER26-1927-000 Commission Order/Opinion 195 FERC ¶ 61,152","publishedAt":"2026-05-28","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260528-3094"},{"id":"ferc-commission-20260528-3092","accession":"20260528-3092","docket":"ER26-1917-000","dockets":["ER26-1917-000","ER26-1917-001"],"caseNo":"ER26-1917-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-28","citation":"195 FERC ¶ 61,151","institution":"Seneca Generation, LLC","library":"Electric","title":"ER26-1917-000 Commission Order/Opinion 195 FERC ¶ 61,151","publishedAt":"2026-05-28","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260528-3092"},{"id":"ferc-commission-20260528-3090","accession":"20260528-3090","docket":"RP26-820-000","dockets":["RP26-820-000"],"caseNo":"RP26-820-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-28","citation":"195 FERC ¶ 61,148","institution":"ANR Pipeline Company","library":"Gas","title":"RP26-820-000 Commission Order/Opinion 195 FERC ¶ 61,148","publishedAt":"2026-05-28","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260528-3090"},{"id":"ferc-commission-20260528-3089","accession":"20260528-3089","docket":"RP26-802-000","dockets":["RP26-802-000"],"caseNo":"RP26-802-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-28","citation":"195 FERC ¶ 61,149","institution":"Southern Star Central Gas Pipeline, Inc.","library":"Gas","title":"RP26-802-000 Commission Order/Opinion 195 FERC ¶ 61,149","publishedAt":"2026-05-28","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260528-3089"},{"id":"ferc-commission-20260528-3087","accession":"20260528-3087","docket":"RP26-797-001","dockets":["RP26-797-001","RP26-797-000"],"caseNo":"RP26-797-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-28","citation":"195 FERC ¶ 61,150","institution":"National Fuel Gas Supply Corporation","library":"Gas","title":"RP26-797-001 Commission Order/Opinion 195 FERC ¶ 61,150","publishedAt":"2026-05-28","page":37,"before":"ferc-commission-20260601-3068","paidUrl":"/ferc-issuances?id=ferc-commission-20260528-3087"},{"id":"ferc-commission-20260527-3073","accession":"20260527-3073","docket":"ER26-1950-000","dockets":["ER26-1950-000"],"caseNo":"ER26-1950-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-27","citation":"195 FERC ¶ 61,146","institution":"Rose Energy Center, LLC","library":"Electric","title":"ER26-1950-000 Commission Order/Opinion 195 FERC ¶ 61,146","publishedAt":"2026-05-27","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260527-3073"},{"id":"ferc-commission-20260527-3026","accession":"20260527-3026","docket":"ER26-1405-000","dockets":["ER26-1405-000"],"caseNo":"ER26-1405-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-27","citation":"195 FERC ¶ 61,147","institution":"Letter order accepting Southwest Power Pool, Inc.'s 02/17/2026 filing of proposed revisions to Attachment AE of its Open Access Transmission Tariff to improve its process for selecting resources to provide regulation service","library":"Electric","title":"ER26-1405-000 Commission Order/Opinion 195 FERC ¶ 61,147","publishedAt":"2026-05-27","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260527-3026"},{"id":"ferc-commission-20260526-3084","accession":"20260526-3084","docket":"ER23-1569-003","dockets":["ER23-1569-003","ER23-1569-000","EL24-34-000"],"caseNo":"ER23-1569-003","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,145","institution":"Letter order approving Yellowbud Solar, LLC's 06/20/2024 filing of an Offer of Settlement and Settlement Agreement addressing its rate schedule for Reactive Supply and Voltage Control from Generation Sources Service etc.","library":"Electric","title":"ER23-1569-003 Commission Order/Opinion 195 FERC ¶ 61,145","publishedAt":"2026-05-26","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3084"},{"id":"ferc-commission-20260526-3059","accession":"20260526-3059","docket":"RP25-936-005","dockets":["RP25-936-005","RP25-936-000","RP24-971-000"],"caseNo":"RP25-936-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,138","institution":"Letter order approving Vector Pipeline L.P.'s 03/12/2026 filing of a stipulation and agreement","library":"Gas","title":"RP25-936-005 Commission Order/Opinion 195 FERC ¶ 61,138","publishedAt":"2026-05-26","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3059"},{"id":"ferc-commission-20260526-3058","accession":"20260526-3058","docket":"EL25-102-000","dockets":["EL25-102-000"],"caseNo":"EL25-102-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,142","institution":"Sonia S. Solis and Julian Solis-Sandoval v. MidAmerican Energy Company et al.","library":"Electric","title":"EL25-102-000 Commission Order/Opinion 195 FERC ¶ 61,142","publishedAt":"2026-05-26","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3058"},{"id":"ferc-commission-20260526-3057","accession":"20260526-3057","docket":"ER25-2438-001","dockets":["ER25-2438-001","ER25-2439-001","ER25-2438-000","ER25-2439-000"],"caseNo":"ER25-2438-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,141","institution":"Letter order approving Tri-State Generation and Transmission Association, Inc.'s 03/17/2026 filing of an Offer of Settlement and Settlement Agreement addressing proposed revisions to its Rate Schedule FERC No. 260","library":"Electric","title":"ER25-2438-001 Commission Order/Opinion 195 FERC ¶ 61,141","publishedAt":"2026-05-26","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3057"},{"id":"ferc-commission-20260526-3054","accession":"20260526-3054","docket":"ER25-2119-000","dockets":["ER25-2119-000","ER25-2120-000","ER25-2121-000","ER25-2122-000","ER25-2118-000"],"caseNo":"ER25-2119-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,140","institution":"Bolt Energy Marketing, LLC et al.","library":"Electric","title":"ER25-2119-000 Commission Order/Opinion 195 FERC ¶ 61,140","publishedAt":"2026-05-26","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3054"},{"id":"ferc-commission-20260526-3053","accession":"20260526-3053","docket":"ER14-1400-002","dockets":["ER14-1400-002","EL22-13-000","ER20-1776-000","EL22-14-000","ER14-1400-000","ER20-1424-003","ER20-1424-000"],"caseNo":"ER14-1400-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,144","institution":"Seneca Generation, LLC et al.","library":"Electric","title":"ER14-1400-002 Commission Order/Opinion 195 FERC ¶ 61,144","publishedAt":"2026-05-26","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3053"},{"id":"ferc-commission-20260526-3051","accession":"20260526-3051","docket":"ER19-2162-008","dockets":["ER19-2162-008","ER19-2152-008","ER19-2153-008","ER19-2161-008","ER19-2163-008","ER19-2157-008","ER19-2151-008","ER19-2158-008","ER19-2155-008","ER19-2159-008","ER19-2150-008","ER19-2160-008","ER19-2164-009","ER19-2156-008","ER26-1978-000"],"caseNo":"ER19-2162-008","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,143","institution":"Blossburg Power, LLC et al.","library":"Electric","title":"ER19-2162-008 Commission Order/Opinion 195 FERC ¶ 61,143","publishedAt":"2026-05-26","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3051"},{"id":"ferc-commission-20260526-3046","accession":"20260526-3046","docket":"ER22-2946-001","dockets":["ER22-2946-001","ER22-2946-000"],"caseNo":"ER22-2946-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-26","citation":"195 FERC ¶ 61,139","institution":"Red Oak Power, LLC","library":"Electric","title":"ER22-2946-001 Commission Order/Opinion 195 FERC ¶ 61,139","publishedAt":"2026-05-26","page":38,"before":"ferc-commission-20260528-3092","paidUrl":"/ferc-issuances?id=ferc-commission-20260526-3046"},{"id":"ferc-commission-20260522-3101","accession":"20260522-3101","docket":"ER26-2321-000","dockets":["ER26-2321-000"],"caseNo":"ER26-2321-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-22","citation":"195 FERC ¶ 61,137","institution":"Zimmer BESS LLC","library":"Electric","title":"ER26-2321-000 Commission Order/Opinion 195 FERC ¶ 61,137","publishedAt":"2026-05-22","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260522-3101"},{"id":"ferc-commission-20260522-3060","accession":"20260522-3060","docket":"RM96-1-044","dockets":["RM96-1-044"],"caseNo":"RM96-1-044","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-22","citation":"195 FERC ¶ 61,135","institution":"Order No. 587-AB: Final Rule; Standards for Business Practices of Interstate Natural Gas Pipelines","library":"GasRulemaking","title":"RM96-1-044 Commission Order/Opinion 195 FERC ¶ 61,135","publishedAt":"2026-05-22","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260522-3060"},{"id":"ferc-commission-20260521-3099","accession":"20260521-3099","docket":"ER26-407-001","dockets":["ER26-407-001"],"caseNo":"ER26-407-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,134","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER26-407-001 Commission Order/Opinion 195 FERC ¶ 61,134","publishedAt":"2026-05-21","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3099"},{"id":"ferc-commission-20260521-3059","accession":"20260521-3059","docket":"CP25-208-002","dockets":["CP25-208-002"],"caseNo":"CP25-208-002","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,129","institution":"Interstate Natural Gas Association of America","library":"Gas","title":"CP25-208-002 Commission Order/Opinion 195 FERC ¶ 61,129","publishedAt":"2026-05-21","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3059"},{"id":"ferc-commission-20260521-3058","accession":"20260521-3058","docket":"RM25-12-001","dockets":["RM25-12-001"],"caseNo":"RM25-12-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,128","institution":"Revisions to the Blanket Certificate Program","library":"GasRulemaking","title":"RM25-12-001 Commission Order/Opinion 195 FERC ¶ 61,128","publishedAt":"2026-05-21","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3058"},{"id":"ferc-commission-20260521-3057","accession":"20260521-3057","docket":"EL26-39-000","dockets":["EL26-39-000"],"caseNo":"EL26-39-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,133","institution":"Gaston Green Acres Solar, LLC et al. v. PJM Interconnection, L.L.C.","library":"Electric","title":"EL26-39-000 Commission Order/Opinion 195 FERC ¶ 61,133","publishedAt":"2026-05-21","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3057"},{"id":"ferc-commission-20260521-3055","accession":"20260521-3055","docket":"CP25-533-000","dockets":["CP25-533-000","CP11-1-000","CP04-379-002"],"caseNo":"CP25-533-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,132","institution":"Pine Prairie Energy Center, LLC's Phase IV Expansion Project","library":"Gas","title":"CP25-533-000 Commission Order/Opinion 195 FERC ¶ 61,132","publishedAt":"2026-05-21","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3055"},{"id":"ferc-commission-20260521-3054","accession":"20260521-3054","docket":"CP26-142-000","dockets":["CP26-142-000"],"caseNo":"CP26-142-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,131","institution":"Port Arthur Pipeline, LLC's Louisiana Connector Project","library":"Gas","title":"CP26-142-000 Commission Order/Opinion 195 FERC ¶ 61,131","publishedAt":"2026-05-21","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3054"},{"id":"ferc-commission-20260521-3053","accession":"20260521-3053","docket":"CP26-8-000","dockets":["CP26-8-000","CP26-6-000","CP26-7-000"],"caseNo":"CP26-8-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,130","institution":"West Texas Gas Utility, LLC et al.","library":"Gas","title":"CP26-8-000 Commission Order/Opinion 195 FERC ¶ 61,130","publishedAt":"2026-05-21","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3053"},{"id":"ferc-commission-20260521-3051","accession":"20260521-3051","docket":"ER23-271-000","dockets":["ER23-271-000","ER23-271-001"],"caseNo":"ER23-271-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,126","institution":"Arizona Public Service Company","library":"Electric","title":"ER23-271-000 Commission Order/Opinion 195 FERC ¶ 61,126","publishedAt":"2026-05-21","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3051"},{"id":"ferc-commission-20260521-3050","accession":"20260521-3050","docket":"ER23-309-000","dockets":["ER23-309-000"],"caseNo":"ER23-309-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,125","institution":"Tucson Electric Power Company","library":"Electric","title":"ER23-309-000 Commission Order/Opinion 195 FERC ¶ 61,125","publishedAt":"2026-05-21","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3050"},{"id":"ferc-commission-20260521-3049","accession":"20260521-3049","docket":"ER22-2316-000","dockets":["ER22-2316-000"],"caseNo":"ER22-2316-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,124","institution":"bp Energy Company","library":"Electric","title":"ER22-2316-000 Commission Order/Opinion 195 FERC ¶ 61,124","publishedAt":"2026-05-21","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3049"},{"id":"ferc-commission-20260521-3048","accession":"20260521-3048","docket":"ER23-272-000","dockets":["ER23-272-000"],"caseNo":"ER23-272-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,123","institution":"Avangrid Renewables, LLC","library":"Electric","title":"ER23-272-000 Commission Order/Opinion 195 FERC ¶ 61,123","publishedAt":"2026-05-21","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3048"},{"id":"ferc-commission-20260521-3047","accession":"20260521-3047","docket":"EL24-6-001","dockets":["EL24-6-001"],"caseNo":"EL24-6-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,122","institution":"Gregory and Beverly Swecker","library":"Electric","title":"EL24-6-001 Commission Order/Opinion 195 FERC ¶ 61,122","publishedAt":"2026-05-21","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3047"},{"id":"ferc-commission-20260521-3046","accession":"20260521-3046","docket":"ER22-24-004","dockets":["ER22-24-004"],"caseNo":"ER22-24-004","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,121","institution":"System Energy Resources, Inc.","library":"Electric","title":"ER22-24-004 Commission Order/Opinion 195 FERC ¶ 61,121","publishedAt":"2026-05-21","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3046"},{"id":"ferc-commission-20260521-3045","accession":"20260521-3045","docket":"EL25-92-000","dockets":["EL25-92-000"],"caseNo":"EL25-92-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-21","citation":"195 FERC ¶ 61,120","institution":"McKenzie Electric Cooperative, Inc. v. Basin Electric Power Cooperative","library":"Electric","title":"EL25-92-000 Commission Order/Opinion 195 FERC ¶ 61,120","publishedAt":"2026-05-21","page":39,"before":"ferc-commission-20260526-3059","paidUrl":"/ferc-issuances?id=ferc-commission-20260521-3045"},{"id":"ferc-commission-20260520-3073","accession":"20260520-3073","docket":"ER24-2564-000","dockets":["ER24-2564-000","ER24-2564-001","EL24-137-000"],"caseNo":"ER24-2564-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-20","citation":"195 FERC ¶ 61,136","institution":"Letter order approving Mid-Atlantic Offshore Development, LLC's 02/24/2026 filing of an Offer of Settlement addressing its proposed transmission formula rate template and formula rate implementation protocols","library":"Electric","title":"ER24-2564-000 Commission Order/Opinion 195 FERC ¶ 61,136","publishedAt":"2026-05-20","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260520-3073"},{"id":"ferc-commission-20260519-3067","accession":"20260519-3067","docket":"CP13-499-007","dockets":["CP13-499-007","CP13-502-004","CP18-5-005"],"caseNo":"CP13-499-007","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-19","citation":"195 FERC ¶ 61,116","institution":"Constitution Pipeline Company, LLC et al.","library":"Gas","title":"CP13-499-007 Commission Order/Opinion 195 FERC ¶ 61,116","publishedAt":"2026-05-19","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260519-3067"},{"id":"ferc-commission-20260515-3032","accession":"20260515-3032","docket":"ER26-1861-000","dockets":["ER26-1861-000"],"caseNo":"ER26-1861-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-15","citation":"195 FERC ¶ 61,119","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER26-1861-000 Commission Order/Opinion 195 FERC ¶ 61,119","publishedAt":"2026-05-15","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260515-3032"},{"id":"ferc-commission-20260515-3029","accession":"20260515-3029","docket":"ER21-894-005","dockets":["ER21-894-005","ER21-895-003","ER21-896-003","ER21-897-002","ER21-904-002","EC98-2-007","ER18-2162-006","ER21-900-002","ER23-2656-003","ER23-2662-002","ER26-1797-000","ER26-1798-000"],"caseNo":"ER21-894-005","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-15","citation":"195 FERC ¶ 61,115","institution":"Louisville Gas and Electric Company et al.","library":"Electric","title":"ER21-894-005 Commission Order/Opinion 195 FERC ¶ 61,115","publishedAt":"2026-05-15","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260515-3029"},{"id":"ferc-commission-20260515-3023","accession":"20260515-3023","docket":"ER26-1800-000","dockets":["ER26-1800-000"],"caseNo":"ER26-1800-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-15","citation":"195 FERC ¶ 61,118","institution":"PJM Interconnection, L.L.C.","library":"Electric","title":"ER26-1800-000 Commission Order/Opinion 195 FERC ¶ 61,118","publishedAt":"2026-05-15","page":40,"before":"ferc-commission-20260521-3051","paidUrl":"/ferc-issuances?id=ferc-commission-20260515-3023"},{"id":"ferc-commission-20260514-3072","accession":"20260514-3072","docket":"CP25-10-000","dockets":["CP25-10-000"],"caseNo":"CP25-10-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-14","citation":"195 FERC ¶ 61,113","institution":"Transcontinental Gas Pipe Line Company, LLC","library":"Gas","title":"CP25-10-000 Commission Order/Opinion 195 FERC ¶ 61,113","publishedAt":"2026-05-14","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260514-3072"},{"id":"ferc-commission-20260514-3050","accession":"20260514-3050","docket":"RM93-11-000","dockets":["RM93-11-000"],"caseNo":"RM93-11-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-14","citation":"195 FERC ¶ 61,114","institution":"Revisions to Oil Pipeline Regulations Pursuant to the Energy Policy Act of 1992","library":"Electric","title":"RM93-11-000 Commission Order/Opinion 195 FERC ¶ 61,114","publishedAt":"2026-05-14","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260514-3050"},{"id":"ferc-commission-20260513-3057","accession":"20260513-3057","docket":"EC26-63-000","dockets":["EC26-63-000"],"caseNo":"EC26-63-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-13","citation":"195 FERC ¶ 61,110","institution":"Bridgeport Energy LLC et al.","library":"Electric","title":"EC26-63-000 Commission Order/Opinion 195 FERC ¶ 61,110","publishedAt":"2026-05-13","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260513-3057"},{"id":"ferc-commission-20260513-3042","accession":"20260513-3042","docket":"ER26-1634-000","dockets":["ER26-1634-000","ER26-1634-001"],"caseNo":"ER26-1634-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-13","citation":"195 FERC ¶ 61,111","institution":"Duke Energy Carolinas, LLC","library":"Electric","title":"ER26-1634-000 Commission Order/Opinion 195 FERC ¶ 61,111","publishedAt":"2026-05-13","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260513-3042"},{"id":"ferc-commission-20260513-3017","accession":"20260513-3017","docket":"EL14-86-000","dockets":["EL14-86-000","EL16-64-000","EL11-66-001","EL11-66-004","EL11-66-005","EL13-33-000","EL13-33-002","EL16-64-002"],"caseNo":"EL14-86-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-13","citation":"195 FERC ¶ 61,108","institution":"Martha Coakley, Attorney General of the Commonwealth of Massachusetts et al. v. Bangor Hydro-Electric Company et al.","library":"Electric","title":"EL14-86-000 Commission Order/Opinion 195 FERC ¶ 61,108","publishedAt":"2026-05-13","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260513-3017"},{"id":"ferc-commission-20260511-3066","accession":"20260511-3066","docket":"CP25-60-001","dockets":["CP25-60-001"],"caseNo":"CP25-60-001","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-11","citation":"195 FERC ¶ 61,099","institution":"Mountain Valley Pipeline, LLC's Southgate Project","library":"Gas","title":"CP25-60-001 Commission Order/Opinion 195 FERC ¶ 61,099","publishedAt":"2026-05-11","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260511-3066"},{"id":"ferc-commission-20260511-3063","accession":"20260511-3063","docket":"ER26-1729-000","dockets":["ER26-1729-000"],"caseNo":"ER26-1729-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-11","citation":"195 FERC ¶ 61,106","institution":"Letter order accepting California Grid Holdings LLC's 03/12/2026 filing of proposed tariff revisions to replicate the Transmission Owner Tariff etc.","library":"Electric","title":"ER26-1729-000 Commission Order/Opinion 195 FERC ¶ 61,106","publishedAt":"2026-05-11","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260511-3063"},{"id":"ferc-commission-20260511-3055","accession":"20260511-3055","docket":"ER26-1593-000","dockets":["ER26-1593-000"],"caseNo":"ER26-1593-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-11","citation":"195 FERC ¶ 61,105","institution":"Letter order accepting California Independent System Operator Corporation's 03/03/2026 filing of an amendment to its Open Access Transmission Tariff etc.","library":"Electric","title":"ER26-1593-000 Commission Order/Opinion 195 FERC ¶ 61,105","publishedAt":"2026-05-11","page":41,"before":"ferc-commission-20260515-3023","paidUrl":"/ferc-issuances?id=ferc-commission-20260511-3055"},{"id":"ferc-commission-20260508-3052","accession":"20260508-3052","docket":"ER26-1316-000","dockets":["ER26-1316-000"],"caseNo":"ER26-1316-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-08","citation":"195 FERC ¶ 61,102","institution":"Southwest Power Pool, Inc.","library":"Electric","title":"ER26-1316-000 Commission Order/Opinion 195 FERC ¶ 61,102","publishedAt":"2026-05-08","page":42,"before":"ferc-commission-20260511-3066","paidUrl":"/ferc-issuances?id=ferc-commission-20260508-3052"},{"id":"ferc-commission-20260508-3051","accession":"20260508-3051","docket":"ER26-1707-000","dockets":["ER26-1707-000"],"caseNo":"ER26-1707-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-08","citation":"195 FERC ¶ 61,104","institution":"Nevada Power Company et al.","library":"Electric","title":"ER26-1707-000 Commission Order/Opinion 195 FERC ¶ 61,104","publishedAt":"2026-05-08","page":42,"before":"ferc-commission-20260511-3066","paidUrl":"/ferc-issuances?id=ferc-commission-20260508-3051"},{"id":"ferc-commission-20260508-3050","accession":"20260508-3050","docket":"ER26-1688-000","dockets":["ER26-1688-000"],"caseNo":"ER26-1688-000","kind":"commission","orderKind":"Commission Order/Opinion","date":"2026-05-08","citation":"195 FERC ¶ 61,103","institution":"Letter order granting Viridon Wisconsin LLC's 03/10/2026 filing of proposed tariff records to replicate the transmission formula rate of Viridon Midcontinent LLC etc.","library":"Electric","title":"ER26-1688-000 Commission Order/Opinion 195 FERC ¶ 61,103","publishedAt":"2026-05-08","page":42,"before":"ferc-commission-20260511-3066","paidUrl":"/ferc-issuances?id=ferc-commission-20260508-3050"},{"id":"ferc-alj-20260505-3058","accession":"20260505-3058","docket":"EL24-67-001","dockets":["EL24-67-001"],"caseNo":"EL24-67-001","kind":"alj","orderKind":"ALJ Initial Decision","date":"2026-05-05","citation":"195 FERC ¶ 63,017","institution":"Viridon New York Inc.","library":"Electric","title":"EL24-67-001 ALJ Initial Decision 195 FERC ¶ 63,017","publishedAt":"2026-05-05","page":42,"before":"ferc-commission-20260511-3066","paidUrl":"/ferc-issuances?id=ferc-alj-20260505-3058"},{"id":"ferc-alj-20251125-3026","accession":"20251125-3026","docket":"EL02-60-018","dockets":["EL02-60-018","EL02-62-017"],"caseNo":"EL02-60-018","kind":"alj","orderKind":"ALJ Initial Decision","date":"2025-11-25","citation":"193 FERC ¶ 63,028","institution":"Public Utilities Commission of the State of California et al. v. Sellers of Long-Terms Contracts to the California Department of Water Resources","library":"Electric","title":"EL02-60-018 ALJ Initial Decision 193 FERC ¶ 63,028","publishedAt":"2025-11-25","page":42,"before":"ferc-commission-20260511-3066","paidUrl":"/ferc-issuances?id=ferc-alj-20251125-3026"}],"schema":{"fields":["id","accession","docket","dockets","caseNo","kind","orderKind","date","citation","institution","library","title"]},"sources":{"search":"https://elibrary.ferc.gov/eLibrarywebapi/api/Search/AdvancedSearch","commission":"Order/Opinion / Commission Order/Opinion","alj":"ALJ Issuance / ALJ Initial Decision"},"search":null,"before":null,"date":null,"openapi":"https://ticks.bnm.farm/openapi.json","wellKnown":"https://ticks.bnm.farm/.well-known/x402","llmsTxt":"https://ticks.bnm.farm/llms.txt","mcp":"https://ticks.bnm.farm/mcp","sample":"https://ticks.bnm.farm/sample","firmCheck":"https://ticks.bnm.farm/firm-check"}